{"title":"Perencanaan Instalasi Listrik di Hotel dan Villa Maua Nusa Penida","authors":"I. W. D. Pancane, R. Silitonga, I. Asna","doi":"10.38043/telsinas.v5i1.3664","DOIUrl":null,"url":null,"abstract":"Maua Nusa Penida is one of the hotels and villas in Nusa Penida which will be discussed in this research. The number of hotel blocks to be built is 4 blocks, where each block consists of 8 rooms. As for the villa as many as 26 various villas. There is also a main building and a restaurant that will serve as future support. Once the existing buildings are complex, the developers are required to plan all the buildings to be built in order to obtain security and also economic factors in the development process. From the results of the planning that has been carried out on each building, each building requires a different number of lights depending on the type of lamp, the type of building and also the area of the building. After getting the total electricity demand in a building, planning is continued by determining the area of cable conductors that supply each building. From the calculation results, it is also known that the type of cable used is planting cable (NYRGbY & NYFGbY) which has good insulation when planted in the ground and follows the provisions of PLN regarding voltage loss, which does not exceed 5% at the end of the conductor. The safety used in buildings uses MCB and also MCCB. Meanwhile, the safety of electric current in the LVMDP and SDP sections uses MCCB components. From the planning results, the total electricity demand is 159,441VA for zone 1 villas and also 142,536VA for zone 2 villas. From this calculation it is also known that the PLN power requirement in each zone is 164,000 VA. To get the convenience and reliability of the electrical system in this hotel and villa, the supply of electrical power in addition to the electricity source from PLN is also equipped with a backup power generator of 200 KVA in each zone.","PeriodicalId":252670,"journal":{"name":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.38043/telsinas.v5i1.3664","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
Maua Nusa Penida是Nusa Penida的酒店和别墅之一,将在本研究中讨论。酒店的数量为4个街区,每个街区由8个房间组成。至于别墅则多达26幢各种别墅。还有一个主楼和一个餐厅,将作为未来的支持。一旦现有的建筑很复杂,开发商就需要规划所有将要建造的建筑,以便在开发过程中获得安全性和经济性因素。从每栋建筑的规划结果来看,每栋建筑需要不同数量的灯,这取决于灯的类型、建筑的类型和建筑的面积。在获得建筑物的总电力需求后,通过确定为每个建筑物供电的电缆导体的面积继续进行规划。从计算结果还可知,所使用的电缆类型为植根电缆(NYRGbY & NYFGbY),植根时绝缘良好,符合PLN对电压损失的规定,导体端部电压损失不超过5%。建筑物中使用的安全装置使用了断路器和断路器。同时,lvdp和SDP部分的电流安全采用塑壳断路器组件。从规划结果来看,1区别墅总用电需求为159,441VA, 2区别墅总用电需求为142,536VA。由此计算可知,各分区的PLN电力需求为16.4万VA。为了保证酒店及别墅电气系统的便利性和可靠性,除PLN电源外,各分区的电力供应还配有200 KVA的备用发电机。
Perencanaan Instalasi Listrik di Hotel dan Villa Maua Nusa Penida
Maua Nusa Penida is one of the hotels and villas in Nusa Penida which will be discussed in this research. The number of hotel blocks to be built is 4 blocks, where each block consists of 8 rooms. As for the villa as many as 26 various villas. There is also a main building and a restaurant that will serve as future support. Once the existing buildings are complex, the developers are required to plan all the buildings to be built in order to obtain security and also economic factors in the development process. From the results of the planning that has been carried out on each building, each building requires a different number of lights depending on the type of lamp, the type of building and also the area of the building. After getting the total electricity demand in a building, planning is continued by determining the area of cable conductors that supply each building. From the calculation results, it is also known that the type of cable used is planting cable (NYRGbY & NYFGbY) which has good insulation when planted in the ground and follows the provisions of PLN regarding voltage loss, which does not exceed 5% at the end of the conductor. The safety used in buildings uses MCB and also MCCB. Meanwhile, the safety of electric current in the LVMDP and SDP sections uses MCCB components. From the planning results, the total electricity demand is 159,441VA for zone 1 villas and also 142,536VA for zone 2 villas. From this calculation it is also known that the PLN power requirement in each zone is 164,000 VA. To get the convenience and reliability of the electrical system in this hotel and villa, the supply of electrical power in addition to the electricity source from PLN is also equipped with a backup power generator of 200 KVA in each zone.