陶氏化学西部事业部研究新项目的前期审查

Michel Desjardin, D. Gustafson, R. Helling, M. Ladd, K. Steele, Danae Vanderhoof
{"title":"陶氏化学西部事业部研究新项目的前期审查","authors":"Michel Desjardin, D. Gustafson, R. Helling, M. Ladd, K. Steele, Danae Vanderhoof","doi":"10.1002/PRSB.720100205","DOIUrl":null,"url":null,"abstract":"The Western Division of Dow Chemical, USA, started a program in the late 1970's to review early stage research projects prior to operation. The name Pre-op (Pre-operational Review) was given to describe the series of steps or process of reviewing projects for safety concerns. In recent years, the process has been examined and improved by a committee of research chemists and engineers. Some of the changes have been dictated by regulatory considerations, but primarily the focus of the continuous improvement effort has been directed at the customers: the users of the system and the research management who are ultimately responsible for the safety of their area. Pre-op reviews are a thorough review of the safety aspects of a new project along with the information necessary to meet current OSHA, EPA, Safety and Loss Prevention Principles, industrial hygiene, and other environmental regulatory concerns. The end result of the Pre-op review process is a document that contains the information needed to understand and review the proposed project. The document is reviewed at a meeting with two to eight reviewers that are not directly involved with the project. The review committee is appointed by a Pre-op Coordinator, a person who administers the system.more » The committee should include research management, research safety management, a site reactive chemicals committee representative, the pilot plant supervisor, operators, an unaffiliated chemist and engineer, and the project supervisor. The committee reviews the document package and then conducts a field inspection of the facility so that a list of recommendations can be generated. The committee recommendations must be completed by the person responsible for the project prior to start-up.« less","PeriodicalId":364732,"journal":{"name":"Plant\\/operations Progress","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1991-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Dow Chemical Western Division Research pre-operational review for new projects\",\"authors\":\"Michel Desjardin, D. Gustafson, R. Helling, M. Ladd, K. Steele, Danae Vanderhoof\",\"doi\":\"10.1002/PRSB.720100205\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Western Division of Dow Chemical, USA, started a program in the late 1970's to review early stage research projects prior to operation. The name Pre-op (Pre-operational Review) was given to describe the series of steps or process of reviewing projects for safety concerns. In recent years, the process has been examined and improved by a committee of research chemists and engineers. Some of the changes have been dictated by regulatory considerations, but primarily the focus of the continuous improvement effort has been directed at the customers: the users of the system and the research management who are ultimately responsible for the safety of their area. Pre-op reviews are a thorough review of the safety aspects of a new project along with the information necessary to meet current OSHA, EPA, Safety and Loss Prevention Principles, industrial hygiene, and other environmental regulatory concerns. The end result of the Pre-op review process is a document that contains the information needed to understand and review the proposed project. The document is reviewed at a meeting with two to eight reviewers that are not directly involved with the project. The review committee is appointed by a Pre-op Coordinator, a person who administers the system.more » The committee should include research management, research safety management, a site reactive chemicals committee representative, the pilot plant supervisor, operators, an unaffiliated chemist and engineer, and the project supervisor. The committee reviews the document package and then conducts a field inspection of the facility so that a list of recommendations can be generated. The committee recommendations must be completed by the person responsible for the project prior to start-up.« less\",\"PeriodicalId\":364732,\"journal\":{\"name\":\"Plant\\\\/operations Progress\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Plant\\\\/operations Progress\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1002/PRSB.720100205\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Plant\\/operations Progress","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/PRSB.720100205","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

美国陶氏化学西部分部在20世纪70年代末开始了一项计划,在运营之前审查早期研究项目。Pre-op (pre -operation Review)这个名称是用来描述为安全考虑而审查项目的一系列步骤或过程。近年来,一个由研究化学家和工程师组成的委员会对这一过程进行了检查和改进。一些变化是出于监管方面的考虑,但持续改进工作的主要重点是针对客户:系统的用户和研究管理人员,他们最终对他们所在地区的安全负责。预操作审查是对新项目安全方面的全面审查,包括满足当前OSHA, EPA,安全和损失预防原则,工业卫生和其他环境法规要求的必要信息。Pre-op评审过程的最终结果是一份文档,其中包含理解和评审提议项目所需的信息。文档在会议上由两到八名不直接参与项目的审稿人进行审查。审查委员会由一名操作前协调员任命,他是管理该系统的人。该委员会应包括研究管理、研究安全管理、现场活性化学品委员会代表、试验工厂主管、操作员、独立化学家和工程师以及项目主管。委员会审查整套文件,然后对该设施进行实地视察,以便产生一份建议清单。委员会的建议必须由项目负责人在启动前完成。«少
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Dow Chemical Western Division Research pre-operational review for new projects
The Western Division of Dow Chemical, USA, started a program in the late 1970's to review early stage research projects prior to operation. The name Pre-op (Pre-operational Review) was given to describe the series of steps or process of reviewing projects for safety concerns. In recent years, the process has been examined and improved by a committee of research chemists and engineers. Some of the changes have been dictated by regulatory considerations, but primarily the focus of the continuous improvement effort has been directed at the customers: the users of the system and the research management who are ultimately responsible for the safety of their area. Pre-op reviews are a thorough review of the safety aspects of a new project along with the information necessary to meet current OSHA, EPA, Safety and Loss Prevention Principles, industrial hygiene, and other environmental regulatory concerns. The end result of the Pre-op review process is a document that contains the information needed to understand and review the proposed project. The document is reviewed at a meeting with two to eight reviewers that are not directly involved with the project. The review committee is appointed by a Pre-op Coordinator, a person who administers the system.more » The committee should include research management, research safety management, a site reactive chemicals committee representative, the pilot plant supervisor, operators, an unaffiliated chemist and engineer, and the project supervisor. The committee reviews the document package and then conducts a field inspection of the facility so that a list of recommendations can be generated. The committee recommendations must be completed by the person responsible for the project prior to start-up.« less
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Using the ASTM CHETAH program in chemical process hazard evaluation Process safety testing program for reducing risks associated with large scale chemical manufacturing operations Predicting and controlling flammability of multiple fuel and multiple inert mixtures Ultimate capacity of blast loaded structures common to chemical plants Disengagement predictions via drift flux correlation vertical, horizontal and spherical vessels
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1