班贾尔马辛市东班贾尔马辛街道Banua Anyar城中村道路发展规划会议

Yandi Gunawan, Irawanto, Bakhtiar, Muhammad Jamili, Akhmad Ridwan, Riky Welli Saputra
{"title":"班贾尔马辛市东班贾尔马辛街道Banua Anyar城中村道路发展规划会议","authors":"Yandi Gunawan, Irawanto, Bakhtiar, Muhammad Jamili, Akhmad Ridwan, Riky Welli Saputra","doi":"10.55927/ijsmr.v1i7.5538","DOIUrl":null,"url":null,"abstract":"This study aims to analyze road development planning in Banua Anyar Village, East Banjarmasin Subdistrict, Banjarmasin City. It identifies constraints and obstacles during the planning meetings in Banua Anyar Subdistrict. The research uses a qualitative approach with a descriptive method. Key informants are the Banua Anyar Village Head and the Head of the Economic and Development Section. Data collected through observation, structured interviews, and documentation. The results show that road construction planning in Banua Anyar Village does not fully comply with existing regulations. Issues include incomplete public information about musrenbang schedules, limited community involvement, and selective invitation to meetings. Facilitators' skills in guiding discussions were also rated poorly. Constraints involve inadequate facilities and places for road construction planning, and sub-optimal human resources from the sub-district and other agencies. This hinders the optimal implementation of Musrenbang according to statutory regulations. To improve, address these shortcomings, and enhance facilitators' skills. Additionally, allocate better resources and infrastructure to ensure effective road development planning in Banua Anyar Village, Banjarmasin City","PeriodicalId":251111,"journal":{"name":"International Journal of Scientific Multidisciplinary Research","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Road Development Planning Meeting in Banua Anyar Urban Village, East Banjarmasin Sub-District, Banjarmasin City\",\"authors\":\"Yandi Gunawan, Irawanto, Bakhtiar, Muhammad Jamili, Akhmad Ridwan, Riky Welli Saputra\",\"doi\":\"10.55927/ijsmr.v1i7.5538\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study aims to analyze road development planning in Banua Anyar Village, East Banjarmasin Subdistrict, Banjarmasin City. It identifies constraints and obstacles during the planning meetings in Banua Anyar Subdistrict. The research uses a qualitative approach with a descriptive method. Key informants are the Banua Anyar Village Head and the Head of the Economic and Development Section. Data collected through observation, structured interviews, and documentation. The results show that road construction planning in Banua Anyar Village does not fully comply with existing regulations. Issues include incomplete public information about musrenbang schedules, limited community involvement, and selective invitation to meetings. Facilitators' skills in guiding discussions were also rated poorly. Constraints involve inadequate facilities and places for road construction planning, and sub-optimal human resources from the sub-district and other agencies. This hinders the optimal implementation of Musrenbang according to statutory regulations. To improve, address these shortcomings, and enhance facilitators' skills. Additionally, allocate better resources and infrastructure to ensure effective road development planning in Banua Anyar Village, Banjarmasin City\",\"PeriodicalId\":251111,\"journal\":{\"name\":\"International Journal of Scientific Multidisciplinary Research\",\"volume\":\"14 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Scientific Multidisciplinary Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55927/ijsmr.v1i7.5538\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Scientific Multidisciplinary Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55927/ijsmr.v1i7.5538","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究旨在分析班加马辛市东班加马辛街道Banua Anyar村的道路发展规划。报告指出了在巴努阿安亚尔街道规划会议期间的制约因素和障碍。本研究采用定性方法和描述性方法。主要的线人是Banua Anyar村长和经济和发展科科长。通过观察、结构化访谈和文件收集的数据。结果表明,Banua Anyar村道路建设规划不完全符合现行规定。问题包括musrenbang时间表的公开信息不完整,社区参与有限,以及有选择性地邀请参加会议。主持人在指导讨论方面的技巧也被评为很差。限制因素包括道路建设规划的设施和场所不足,街道和其他机构的人力资源不理想。这阻碍了穆仁弹按照法律规定的最佳执行。要改进,解决这些缺点,并提高主持人的技能。此外,分配更好的资源和基础设施,以确保班加马辛市巴努阿安亚尔村的有效道路发展规划
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Road Development Planning Meeting in Banua Anyar Urban Village, East Banjarmasin Sub-District, Banjarmasin City
This study aims to analyze road development planning in Banua Anyar Village, East Banjarmasin Subdistrict, Banjarmasin City. It identifies constraints and obstacles during the planning meetings in Banua Anyar Subdistrict. The research uses a qualitative approach with a descriptive method. Key informants are the Banua Anyar Village Head and the Head of the Economic and Development Section. Data collected through observation, structured interviews, and documentation. The results show that road construction planning in Banua Anyar Village does not fully comply with existing regulations. Issues include incomplete public information about musrenbang schedules, limited community involvement, and selective invitation to meetings. Facilitators' skills in guiding discussions were also rated poorly. Constraints involve inadequate facilities and places for road construction planning, and sub-optimal human resources from the sub-district and other agencies. This hinders the optimal implementation of Musrenbang according to statutory regulations. To improve, address these shortcomings, and enhance facilitators' skills. Additionally, allocate better resources and infrastructure to ensure effective road development planning in Banua Anyar Village, Banjarmasin City
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Implementation of the Code of Ethics for State Civil Apparatus in the Muara Bangkahulu Sub-District of Bengkulu City Potential of Purple Sweet Potato (Ipomoea batatas var. Ayamurasaki) Skin Extract Cream Preparation as an Antibacterial Against the Growth Activity of Propionibacterium acnes Spiritual Leadership and Organizational Citizenship Behavior as Factors Influencing Employee Performance:A Literature Review Mass Certification Policy for Community Land Objects Experiences and Strategies of Talipapa Vendors in Transitioning to The New Normal
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1