{"title":"电力IT设备的测试与评价","authors":"Seong-Jeong Rim, Yong-Jun Lee, Won-Tae Lee","doi":"10.1109/TD-ASIA.2009.5356846","DOIUrl":null,"url":null,"abstract":"This paper discusses the test and evaluation scheme for IEC 61850-based electric power IT equipments. Various IEC 61850-based power IT equipments produced by multi-vendor will consist of the actual test site for smart grid. Site acceptance test (SAT) which carried out the completely installed equipment in the site, gives the confirmation to customer before operation. Conformance tests have to perform in order to achieve the effective SAT. However, devices are passed conformance test, it may still remains the issues during integration, commissioning and operation. To reduce the number of costly issue and problems during integration, site commissioning and operation, therefore, interoperability test is required as well as conformance test.","PeriodicalId":131589,"journal":{"name":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Test and evaluation for power IT apparatus\",\"authors\":\"Seong-Jeong Rim, Yong-Jun Lee, Won-Tae Lee\",\"doi\":\"10.1109/TD-ASIA.2009.5356846\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper discusses the test and evaluation scheme for IEC 61850-based electric power IT equipments. Various IEC 61850-based power IT equipments produced by multi-vendor will consist of the actual test site for smart grid. Site acceptance test (SAT) which carried out the completely installed equipment in the site, gives the confirmation to customer before operation. Conformance tests have to perform in order to achieve the effective SAT. However, devices are passed conformance test, it may still remains the issues during integration, commissioning and operation. To reduce the number of costly issue and problems during integration, site commissioning and operation, therefore, interoperability test is required as well as conformance test.\",\"PeriodicalId\":131589,\"journal\":{\"name\":\"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific\",\"volume\":\"44 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TD-ASIA.2009.5356846\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TD-ASIA.2009.5356846","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文讨论了基于IEC 61850标准的电力IT设备的测试与评价方案。多家厂商生产的各种基于IEC 61850标准的电力IT设备将构成智能电网的实际测试场地。现场验收测试(SAT)是对设备在现场全部安装完成后进行的验收,在运行前向客户进行确认。为了达到有效的SAT,必须进行一致性测试。然而,设备通过了一致性测试,在集成、调试和运行过程中可能仍然存在问题。因此,为了减少集成、站点调试和操作过程中代价高昂的问题和问题的数量,需要互操作性测试以及一致性测试。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Test and evaluation for power IT apparatus
This paper discusses the test and evaluation scheme for IEC 61850-based electric power IT equipments. Various IEC 61850-based power IT equipments produced by multi-vendor will consist of the actual test site for smart grid. Site acceptance test (SAT) which carried out the completely installed equipment in the site, gives the confirmation to customer before operation. Conformance tests have to perform in order to achieve the effective SAT. However, devices are passed conformance test, it may still remains the issues during integration, commissioning and operation. To reduce the number of costly issue and problems during integration, site commissioning and operation, therefore, interoperability test is required as well as conformance test.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Operational analysis of DC micro-grid using detailed model of distributed generation Real time digital simulator based test system for microgrid management system Case study of customer baseline(CBL) load determination in Korea based on statistical method Assessment of Conditional Value at Risk (CVaR) in transmission investment using Cross Entropy method Governor-response power flow (GRPF) based long-term voltage stability simulation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1