N. Annamalai, Narendra Kumar Patel, Subramaniam Muthukarapan
{"title":"使用TRIZ进行SHBI PM优化的突破性创新解决方案","authors":"N. Annamalai, Narendra Kumar Patel, Subramaniam Muthukarapan","doi":"10.1109/IEMT.2008.5507884","DOIUrl":null,"url":null,"abstract":"Preventive maintenance (PM) is a crucial activity to ensure the stability and performance of a tool. It has lead to long hour and tedious activity on SHBI (Self Heat Burn-In). SHBI is a tool used to support the Burn-In process. SHBI carries several long hour PM task which also requires some conversion activities. This has been leading to a total >15% weekly capacity loss. This paper will discuss on how both the unproductive long hour activities have been analyzed through theory of innovative problem solving (TRIZ) methodology.","PeriodicalId":151085,"journal":{"name":"2008 33rd IEEE/CPMT International Electronics Manufacturing Technology Conference (IEMT)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Radical breakthrough innovative solution in SHBI PM optimization using TRIZ\",\"authors\":\"N. Annamalai, Narendra Kumar Patel, Subramaniam Muthukarapan\",\"doi\":\"10.1109/IEMT.2008.5507884\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Preventive maintenance (PM) is a crucial activity to ensure the stability and performance of a tool. It has lead to long hour and tedious activity on SHBI (Self Heat Burn-In). SHBI is a tool used to support the Burn-In process. SHBI carries several long hour PM task which also requires some conversion activities. This has been leading to a total >15% weekly capacity loss. This paper will discuss on how both the unproductive long hour activities have been analyzed through theory of innovative problem solving (TRIZ) methodology.\",\"PeriodicalId\":151085,\"journal\":{\"name\":\"2008 33rd IEEE/CPMT International Electronics Manufacturing Technology Conference (IEMT)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 33rd IEEE/CPMT International Electronics Manufacturing Technology Conference (IEMT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEMT.2008.5507884\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 33rd IEEE/CPMT International Electronics Manufacturing Technology Conference (IEMT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEMT.2008.5507884","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Radical breakthrough innovative solution in SHBI PM optimization using TRIZ
Preventive maintenance (PM) is a crucial activity to ensure the stability and performance of a tool. It has lead to long hour and tedious activity on SHBI (Self Heat Burn-In). SHBI is a tool used to support the Burn-In process. SHBI carries several long hour PM task which also requires some conversion activities. This has been leading to a total >15% weekly capacity loss. This paper will discuss on how both the unproductive long hour activities have been analyzed through theory of innovative problem solving (TRIZ) methodology.