{"title":"ZY-3型立体影像在电力工程测量中的精度评价","authors":"Shouchao Hu, Yaguang Zhu","doi":"10.1109/ICGMRS55602.2022.9849374","DOIUrl":null,"url":null,"abstract":"As the first civilian high resolution stereo mapping satellite in China, the ZY-3 satellite can obtain high-precision terrain data efficiently and quickly, which has broad application prospects. In order to verify the application effect of the ZY-3 data in electric power engineering survey, this paper selects a transmission line project and a wind farm topographic mapping project as the experimental areas. The elevation accuracy of the ZY-3 satellite products is evaluated. Compared with the accuracy of STRM DEM, the results show that the accuracy of ZY-3 satellite data is better than STRM DEM, which can play a good auxiliary role in the electric power engineering survey and design stage.","PeriodicalId":129909,"journal":{"name":"2022 3rd International Conference on Geology, Mapping and Remote Sensing (ICGMRS)","volume":"160 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-04-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Accuracy Assessment of ZY-3 Stereo Images in Electric Power Engineering Survey\",\"authors\":\"Shouchao Hu, Yaguang Zhu\",\"doi\":\"10.1109/ICGMRS55602.2022.9849374\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As the first civilian high resolution stereo mapping satellite in China, the ZY-3 satellite can obtain high-precision terrain data efficiently and quickly, which has broad application prospects. In order to verify the application effect of the ZY-3 data in electric power engineering survey, this paper selects a transmission line project and a wind farm topographic mapping project as the experimental areas. The elevation accuracy of the ZY-3 satellite products is evaluated. Compared with the accuracy of STRM DEM, the results show that the accuracy of ZY-3 satellite data is better than STRM DEM, which can play a good auxiliary role in the electric power engineering survey and design stage.\",\"PeriodicalId\":129909,\"journal\":{\"name\":\"2022 3rd International Conference on Geology, Mapping and Remote Sensing (ICGMRS)\",\"volume\":\"160 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-04-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 3rd International Conference on Geology, Mapping and Remote Sensing (ICGMRS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICGMRS55602.2022.9849374\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 3rd International Conference on Geology, Mapping and Remote Sensing (ICGMRS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICGMRS55602.2022.9849374","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Accuracy Assessment of ZY-3 Stereo Images in Electric Power Engineering Survey
As the first civilian high resolution stereo mapping satellite in China, the ZY-3 satellite can obtain high-precision terrain data efficiently and quickly, which has broad application prospects. In order to verify the application effect of the ZY-3 data in electric power engineering survey, this paper selects a transmission line project and a wind farm topographic mapping project as the experimental areas. The elevation accuracy of the ZY-3 satellite products is evaluated. Compared with the accuracy of STRM DEM, the results show that the accuracy of ZY-3 satellite data is better than STRM DEM, which can play a good auxiliary role in the electric power engineering survey and design stage.