基于过程的软件项目经理软技能识别

M. Pinkowska, B. Lent, Somnuk Keretho
{"title":"基于过程的软件项目经理软技能识别","authors":"M. Pinkowska, B. Lent, Somnuk Keretho","doi":"10.1109/JCSSE.2011.5930145","DOIUrl":null,"url":null,"abstract":"Practice and science today agree that software project managers have to master soft skills in order to be successful. Lack of justified, derived from concrete needs, essential soft skills identification makes their mastering impossible. The research model presented hereafter is build on detailed investigation of human factor related processes in software project management and subsequent identification of project manager soft skills needed to perform these processes. The L-Timer™ process based mental model of project management is chosen for the evaluation. Innovative and systematic approach identified at least 645 human factor related activities. Their effective execution requires mastering of at least 256 soft skills.","PeriodicalId":287775,"journal":{"name":"2011 Eighth International Joint Conference on Computer Science and Software Engineering (JCSSE)","volume":"61 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-05-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":"{\"title\":\"Process based identification of software project manager soft skills\",\"authors\":\"M. Pinkowska, B. Lent, Somnuk Keretho\",\"doi\":\"10.1109/JCSSE.2011.5930145\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Practice and science today agree that software project managers have to master soft skills in order to be successful. Lack of justified, derived from concrete needs, essential soft skills identification makes their mastering impossible. The research model presented hereafter is build on detailed investigation of human factor related processes in software project management and subsequent identification of project manager soft skills needed to perform these processes. The L-Timer™ process based mental model of project management is chosen for the evaluation. Innovative and systematic approach identified at least 645 human factor related activities. Their effective execution requires mastering of at least 256 soft skills.\",\"PeriodicalId\":287775,\"journal\":{\"name\":\"2011 Eighth International Joint Conference on Computer Science and Software Engineering (JCSSE)\",\"volume\":\"61 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-05-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 Eighth International Joint Conference on Computer Science and Software Engineering (JCSSE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/JCSSE.2011.5930145\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 Eighth International Joint Conference on Computer Science and Software Engineering (JCSSE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/JCSSE.2011.5930145","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

摘要

今天的实践和科学一致认为,软件项目经理必须掌握软技能才能取得成功。缺乏合理的、源自具体需求的、必要的软技能识别,使它们不可能掌握。本文提出的研究模型是建立在对软件项目管理中与人为因素相关的过程的详细调查,以及随后对执行这些过程所需的项目经理软技能的识别之上的。选择基于L-Timer™过程的项目管理心智模型进行评估。创新和系统的方法确定了至少645个与人为因素相关的活动。它们的有效执行需要掌握至少256项软技能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Process based identification of software project manager soft skills
Practice and science today agree that software project managers have to master soft skills in order to be successful. Lack of justified, derived from concrete needs, essential soft skills identification makes their mastering impossible. The research model presented hereafter is build on detailed investigation of human factor related processes in software project management and subsequent identification of project manager soft skills needed to perform these processes. The L-Timer™ process based mental model of project management is chosen for the evaluation. Innovative and systematic approach identified at least 645 human factor related activities. Their effective execution requires mastering of at least 256 soft skills.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Transforming state tables to Coloured Petri nets for automatic verification of internet protocols Clustering by attraction and distraction Event recognition from information-linkage based using phrase tree traversal Towards a complete project oriented risk management model: A refinement of PRORISK Solving software module clustering problem by evolutionary algorithms
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1