电力系统备用电力空间优化分配的综合方法

S.S. Halilcevic, F. Gubina
{"title":"电力系统备用电力空间优化分配的综合方法","authors":"S.S. Halilcevic, F. Gubina","doi":"10.1109/PTC.1999.826454","DOIUrl":null,"url":null,"abstract":"This article presents an emergency control system, the results of a series of the offline procedures, designed to act correctively in the case of transmission line outages. The corrective actions have to do with introducing various forms of active and reactive operating reserves (spinning reserve, ready reserve, VAr equipment and load shedding). The suggested methodology, applied through the mentioned procedures, results in information arrangeable in tables and/or a chart of introducing particular segments of the operating reserve, together with the already scheduled generators, selecting the one suited best for the actual level and distribution of the system's load.","PeriodicalId":101688,"journal":{"name":"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-08-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"On optimal space distribution of ready-reserve in a power system-comprehensive approach\",\"authors\":\"S.S. Halilcevic, F. Gubina\",\"doi\":\"10.1109/PTC.1999.826454\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article presents an emergency control system, the results of a series of the offline procedures, designed to act correctively in the case of transmission line outages. The corrective actions have to do with introducing various forms of active and reactive operating reserves (spinning reserve, ready reserve, VAr equipment and load shedding). The suggested methodology, applied through the mentioned procedures, results in information arrangeable in tables and/or a chart of introducing particular segments of the operating reserve, together with the already scheduled generators, selecting the one suited best for the actual level and distribution of the system's load.\",\"PeriodicalId\":101688,\"journal\":{\"name\":\"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)\",\"volume\":\"25 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-08-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PTC.1999.826454\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PTC.1999.826454","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文介绍了一个应急控制系统,该系统是一系列脱机程序的结果,旨在在输电线路中断的情况下采取正确的行动。纠正措施与引入各种形式的主动和被动操作储备(旋转储备、准备储备、VAr设备和减载)有关。建议的方法,通过上述程序加以应用,结果产生了可在表格和/或图表中安排的资料,其中介绍了运行储备的特定部分,以及已经安排的发电机,选择最适合系统负荷的实际水平和分布的发电机。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
On optimal space distribution of ready-reserve in a power system-comprehensive approach
This article presents an emergency control system, the results of a series of the offline procedures, designed to act correctively in the case of transmission line outages. The corrective actions have to do with introducing various forms of active and reactive operating reserves (spinning reserve, ready reserve, VAr equipment and load shedding). The suggested methodology, applied through the mentioned procedures, results in information arrangeable in tables and/or a chart of introducing particular segments of the operating reserve, together with the already scheduled generators, selecting the one suited best for the actual level and distribution of the system's load.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The role of the power companies in the fuel cell market A smart security screening approach for large scale power systems Detection of insulator ageing State estimation of electric power system for new technological systems Adaptive equivalenting for calculations of electric power system state
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1