投标后腐败和风险分配:对公私伙伴关系的影响

E. Iossa, D. Martimort
{"title":"投标后腐败和风险分配:对公私伙伴关系的影响","authors":"E. Iossa, D. Martimort","doi":"10.2139/ssrn.1846507","DOIUrl":null,"url":null,"abstract":"Whilst a lot has been said about how to fight corruption at tender stage in public procurement, post-tender corruption is an issue that remains almost unexplored. In this paper, we make a step towards filling this gap, by studying the relationship between the quality of a country's institutions, in particular its monitoring technologies and corruption, and the level and form of risk transfer to the contractor. We discuss the desirability of state-contingent clauses, which provide insurance to the contractor but are at high risk of manipulation. We derive implications on the benefit and cost of procurement forms which are based on high levels of risk transfer to the private sector, such as Public Private Partnerships (PPPs).","PeriodicalId":416571,"journal":{"name":"CEIS: Centre for Economic & International Studies Working Paper Series","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-05-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":"{\"title\":\"Post-Tender Corruption and Risk Allocation: Implications for Public-Private Partnerships\",\"authors\":\"E. Iossa, D. Martimort\",\"doi\":\"10.2139/ssrn.1846507\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Whilst a lot has been said about how to fight corruption at tender stage in public procurement, post-tender corruption is an issue that remains almost unexplored. In this paper, we make a step towards filling this gap, by studying the relationship between the quality of a country's institutions, in particular its monitoring technologies and corruption, and the level and form of risk transfer to the contractor. We discuss the desirability of state-contingent clauses, which provide insurance to the contractor but are at high risk of manipulation. We derive implications on the benefit and cost of procurement forms which are based on high levels of risk transfer to the private sector, such as Public Private Partnerships (PPPs).\",\"PeriodicalId\":416571,\"journal\":{\"name\":\"CEIS: Centre for Economic & International Studies Working Paper Series\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-05-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"16\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"CEIS: Centre for Economic & International Studies Working Paper Series\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.1846507\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"CEIS: Centre for Economic & International Studies Working Paper Series","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.1846507","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 16

摘要

在公共采购中,如何打击投标阶段的腐败问题已经讨论了很多,但投标后的腐败问题却几乎没有被探讨过。在本文中,我们通过研究一个国家机构的质量,特别是其监测技术和腐败之间的关系,以及向承包商转移风险的水平和形式,朝着填补这一空白迈出了一步。我们讨论了国家或有条款的可取性,这些条款为承包商提供了保险,但存在很高的操纵风险。我们得出了基于高风险向私营部门转移的采购形式的收益和成本的影响,例如公私合作伙伴关系(ppp)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Post-Tender Corruption and Risk Allocation: Implications for Public-Private Partnerships
Whilst a lot has been said about how to fight corruption at tender stage in public procurement, post-tender corruption is an issue that remains almost unexplored. In this paper, we make a step towards filling this gap, by studying the relationship between the quality of a country's institutions, in particular its monitoring technologies and corruption, and the level and form of risk transfer to the contractor. We discuss the desirability of state-contingent clauses, which provide insurance to the contractor but are at high risk of manipulation. We derive implications on the benefit and cost of procurement forms which are based on high levels of risk transfer to the private sector, such as Public Private Partnerships (PPPs).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Modelling Cycles in Climate Series: The Fractional Sinusoidal Waveform Process Three Liquid Assets Efficient Nonparametric Estimation of Generalized Autocovariances Partnership Dissolution with Cash-Constrained Agents Pre-selection in Cointegration-based Pairs Trading
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1