{"title":"马来西亚住宅项目施工延误的原因","authors":"M. Z. Ramli, A. Nordin, Nursyadzatul Tasnim Roslin, N. B. Hamid, N. S. Azman, N. Zahari","doi":"10.1063/1.5118038","DOIUrl":null,"url":null,"abstract":"Every organization that is involved with the construction industry undoubtedly has delayed progress at some phase in their project or development. Delay in construction project become a common situ...","PeriodicalId":112912,"journal":{"name":"APPLIED PHYSICS OF CONDENSED MATTER (APCOM 2019)","volume":"58 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Causes of construction delay for housing projects in Malaysia\",\"authors\":\"M. Z. Ramli, A. Nordin, Nursyadzatul Tasnim Roslin, N. B. Hamid, N. S. Azman, N. Zahari\",\"doi\":\"10.1063/1.5118038\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Every organization that is involved with the construction industry undoubtedly has delayed progress at some phase in their project or development. Delay in construction project become a common situ...\",\"PeriodicalId\":112912,\"journal\":{\"name\":\"APPLIED PHYSICS OF CONDENSED MATTER (APCOM 2019)\",\"volume\":\"58 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"APPLIED PHYSICS OF CONDENSED MATTER (APCOM 2019)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1063/1.5118038\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"APPLIED PHYSICS OF CONDENSED MATTER (APCOM 2019)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1063/1.5118038","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Causes of construction delay for housing projects in Malaysia
Every organization that is involved with the construction industry undoubtedly has delayed progress at some phase in their project or development. Delay in construction project become a common situ...