{"title":"如何应对宽带部署决策过程中的风险和不确定性","authors":"M. Fijnvandraat","doi":"10.1109/INFRA.2008.5439594","DOIUrl":null,"url":null,"abstract":"In the process of upgrading of broadband networks, operators are confronted with several risks and uncertainties. In this paper, we will map risks and uncertainties in broadband decision-making and classify the risks and uncertainties to nature, level, and source. Classification into nature and level are measured by means of quantitative research, comprising an international survey among 87 experts, originating from fourteen countries worldwide. To manage these risk and uncertainties several methods can be applied. The preference of operators for risk and uncertainty decreasing methods are also investigated in our research.","PeriodicalId":207041,"journal":{"name":"2008 First International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"How to deal with risk and uncertainty in the decision-making process on broadband roll out\",\"authors\":\"M. Fijnvandraat\",\"doi\":\"10.1109/INFRA.2008.5439594\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the process of upgrading of broadband networks, operators are confronted with several risks and uncertainties. In this paper, we will map risks and uncertainties in broadband decision-making and classify the risks and uncertainties to nature, level, and source. Classification into nature and level are measured by means of quantitative research, comprising an international survey among 87 experts, originating from fourteen countries worldwide. To manage these risk and uncertainties several methods can be applied. The preference of operators for risk and uncertainty decreasing methods are also investigated in our research.\",\"PeriodicalId\":207041,\"journal\":{\"name\":\"2008 First International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 First International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INFRA.2008.5439594\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 First International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INFRA.2008.5439594","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
How to deal with risk and uncertainty in the decision-making process on broadband roll out
In the process of upgrading of broadband networks, operators are confronted with several risks and uncertainties. In this paper, we will map risks and uncertainties in broadband decision-making and classify the risks and uncertainties to nature, level, and source. Classification into nature and level are measured by means of quantitative research, comprising an international survey among 87 experts, originating from fourteen countries worldwide. To manage these risk and uncertainties several methods can be applied. The preference of operators for risk and uncertainty decreasing methods are also investigated in our research.