{"title":"基于粗糙集方法的产品到期日不确定因素模糊度量与评价","authors":"Hui Chen, Chuanjun Zhu","doi":"10.1109/DBTA.2010.5658958","DOIUrl":null,"url":null,"abstract":"In order to measure and evauate the uncertain factors impacting on the due date of product, the impact factors of the completion date of product on shop floor is intensive investigated firstly. The data of uncertain factors which affected the completion date of products are sorted out, the decision system was made of impact factors that correlative with the completion date of product, and was analyzed by Dominance based Rough Sets Approach. The fuzzy measure based on the classify quality of decision system is introduced to appraise the importance of the impact factors for the completion date of product. By the fuzzy measure, the interdependence of two impact factors is discussed.","PeriodicalId":320509,"journal":{"name":"2010 2nd International Workshop on Database Technology and Applications","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Fuzzy Measure and Evaluation of Uncertain Factors on Due Date for Product Based on Rough Set Approach\",\"authors\":\"Hui Chen, Chuanjun Zhu\",\"doi\":\"10.1109/DBTA.2010.5658958\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In order to measure and evauate the uncertain factors impacting on the due date of product, the impact factors of the completion date of product on shop floor is intensive investigated firstly. The data of uncertain factors which affected the completion date of products are sorted out, the decision system was made of impact factors that correlative with the completion date of product, and was analyzed by Dominance based Rough Sets Approach. The fuzzy measure based on the classify quality of decision system is introduced to appraise the importance of the impact factors for the completion date of product. By the fuzzy measure, the interdependence of two impact factors is discussed.\",\"PeriodicalId\":320509,\"journal\":{\"name\":\"2010 2nd International Workshop on Database Technology and Applications\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-12-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 2nd International Workshop on Database Technology and Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/DBTA.2010.5658958\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 2nd International Workshop on Database Technology and Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DBTA.2010.5658958","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Fuzzy Measure and Evaluation of Uncertain Factors on Due Date for Product Based on Rough Set Approach
In order to measure and evauate the uncertain factors impacting on the due date of product, the impact factors of the completion date of product on shop floor is intensive investigated firstly. The data of uncertain factors which affected the completion date of products are sorted out, the decision system was made of impact factors that correlative with the completion date of product, and was analyzed by Dominance based Rough Sets Approach. The fuzzy measure based on the classify quality of decision system is introduced to appraise the importance of the impact factors for the completion date of product. By the fuzzy measure, the interdependence of two impact factors is discussed.