{"title":"道路工程索赔与理赔","authors":"T. Manda, S. Samant, Kartik Pendhe, Rohan Naphade, Harshita Gupta, S. Yadav","doi":"10.33736/JCEST.1430.2019","DOIUrl":null,"url":null,"abstract":"Claims are becoming inevitable and unavoidable in modern projects involving new technology, specifications, and complexities. There are many reasons for claims, for instance time extension, machinery change, material deviation, manpower, price escalation, accidents on site, changes in design, etc., which result into disputes. Confusion also exists in adoption of dispute resolution techniques, such as arbitration, conciliation, mediation, dispute resolution board, etc. In this paper, various factors responsible for claims and dispute in road projects and their intensity have been identified. The results are implied through a survey of clients, contractors, and consultants involved in road projects. The work focuses on the predominant causes of dispute and the methodology adopted by stake holders for settlement of the same.","PeriodicalId":346729,"journal":{"name":"Journal of Civil Engineering, Science and Technology","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"CLAIMS AND SETTLEMENT IN ROAD PROJECT\",\"authors\":\"T. Manda, S. Samant, Kartik Pendhe, Rohan Naphade, Harshita Gupta, S. Yadav\",\"doi\":\"10.33736/JCEST.1430.2019\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Claims are becoming inevitable and unavoidable in modern projects involving new technology, specifications, and complexities. There are many reasons for claims, for instance time extension, machinery change, material deviation, manpower, price escalation, accidents on site, changes in design, etc., which result into disputes. Confusion also exists in adoption of dispute resolution techniques, such as arbitration, conciliation, mediation, dispute resolution board, etc. In this paper, various factors responsible for claims and dispute in road projects and their intensity have been identified. The results are implied through a survey of clients, contractors, and consultants involved in road projects. The work focuses on the predominant causes of dispute and the methodology adopted by stake holders for settlement of the same.\",\"PeriodicalId\":346729,\"journal\":{\"name\":\"Journal of Civil Engineering, Science and Technology\",\"volume\":\"5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Civil Engineering, Science and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33736/JCEST.1430.2019\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Civil Engineering, Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33736/JCEST.1430.2019","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在涉及新技术、规范和复杂性的现代项目中,索赔变得不可避免和不可避免。索赔的原因有很多,如工期延长、机器更换、材料偏差、人力、价格上涨、现场事故、设计变更等,这些都导致了纠纷。在采用仲裁、调解、调解、争议解决委员会等争议解决手段方面也存在混淆。本文确定了道路工程索赔和纠纷的各种因素及其强度。这一结果是通过对参与道路项目的客户、承包商和顾问的调查得出的。这项工作的重点是争端的主要原因和利益相关者为解决争端所采取的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
CLAIMS AND SETTLEMENT IN ROAD PROJECT
Claims are becoming inevitable and unavoidable in modern projects involving new technology, specifications, and complexities. There are many reasons for claims, for instance time extension, machinery change, material deviation, manpower, price escalation, accidents on site, changes in design, etc., which result into disputes. Confusion also exists in adoption of dispute resolution techniques, such as arbitration, conciliation, mediation, dispute resolution board, etc. In this paper, various factors responsible for claims and dispute in road projects and their intensity have been identified. The results are implied through a survey of clients, contractors, and consultants involved in road projects. The work focuses on the predominant causes of dispute and the methodology adopted by stake holders for settlement of the same.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
RETRACTION NOTE TO: ASSESSING SEISMIC SOIL LIQUEFACTION POTENTIAL USING MACHINE LEARNING APPROACH EFFECT OF ADDITION OF CaO ON COMPRESSIVE STRENGTH OF HIGH-VOLUME FLY ASH CONCRETE EDITORIAL SCOPE – WASTE MANAGEMENT AND RECYCLING MATLAB PROGRAM FOR RATING SOILS BASED ON ENGINEERING BEHAVIOURS NONLINEAR LATERAL RESPONSE OF PILE GROUP IN CLAY USING THE MODIFIED CAM CLAY SOIL MODEL
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1