评估干系人在项目执行阶段的参与程度

Kamal Jaafar, S. M. Yusof
{"title":"评估干系人在项目执行阶段的参与程度","authors":"Kamal Jaafar, S. M. Yusof","doi":"10.19255/JMPM01909","DOIUrl":null,"url":null,"abstract":"The study aim is to examine the involvement level of the stakeholders during the project execution process. Stakeholders play a vital role in providing the needed resources and Ultimately they have strong influence on project success. The research intends to formulate a matrix which will reflect the list of elements which effect the project execution, type of stakeholder involved for each element, involvement level of each stakeholder which resulted in the delay of the execution, Criticality of involvement on project which will result in the output answer we are seeking the process of involvement for each stakeholder.","PeriodicalId":320094,"journal":{"name":"The Journal of Modern Project Management","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Evaluating Stakeholder's Level of Involvement in Project Execution Phase\",\"authors\":\"Kamal Jaafar, S. M. Yusof\",\"doi\":\"10.19255/JMPM01909\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The study aim is to examine the involvement level of the stakeholders during the project execution process. Stakeholders play a vital role in providing the needed resources and Ultimately they have strong influence on project success. The research intends to formulate a matrix which will reflect the list of elements which effect the project execution, type of stakeholder involved for each element, involvement level of each stakeholder which resulted in the delay of the execution, Criticality of involvement on project which will result in the output answer we are seeking the process of involvement for each stakeholder.\",\"PeriodicalId\":320094,\"journal\":{\"name\":\"The Journal of Modern Project Management\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-05-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Journal of Modern Project Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.19255/JMPM01909\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Journal of Modern Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19255/JMPM01909","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

研究的目的是考察项目执行过程中利益相关者的参与程度。干系人在提供所需资源方面起着至关重要的作用,最终他们对项目的成功有很大的影响。本研究拟建立一个矩阵,该矩阵将反映影响项目执行的要素列表、每个要素所涉及的利益相关者类型、导致执行延迟的每个利益相关者的参与程度、项目参与的关键性,这将导致我们正在寻求的每个利益相关者的参与过程的输出答案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Evaluating Stakeholder's Level of Involvement in Project Execution Phase
The study aim is to examine the involvement level of the stakeholders during the project execution process. Stakeholders play a vital role in providing the needed resources and Ultimately they have strong influence on project success. The research intends to formulate a matrix which will reflect the list of elements which effect the project execution, type of stakeholder involved for each element, involvement level of each stakeholder which resulted in the delay of the execution, Criticality of involvement on project which will result in the output answer we are seeking the process of involvement for each stakeholder.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Project recovery: Project failures and how to get rid of them Agile Enhancement of Critical PMBoK v6 Processes Whole Life Program Success, Leadership Competencies and Motivation for Learning – UK Defence Case Project Resource Optimization Considering Labor Productivity Factors Service based framework of research projects in higher education institutions
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1