{"title":"曼谷轻轨沿线高层建筑施工风险识别与分析","authors":"Vichian Puncreobutr, Vipa Pengsa-ium, Yongyut Khamkhong, Tanit Kriengsantikul","doi":"10.2139/ssrn.3179360","DOIUrl":null,"url":null,"abstract":"The research on Identifying and Analyzing Risk in the Construction of High Rise Buildings Along the Sky Train Rails in Bangkok has the objective of studying the risk factors, guidelines for the prevention and rectification of the risks in the construction of high rise buildings along the Sky train rails in Bangkok. The sample group consisted of those involved in the 6 developing projects of high rise building construction along the Sky train rails in Bangkok. Information collected from in-depth interviews, Analyzed results with risk assessment techniques and content analysis techniques. It is found from the study that the risk factors arose are both from internally and externally. That the highest risks occurred in every phrase of the construction, from the designing phrase to the post construction phrase. It is also found that the guidelines in preventing and rectification of risks, especially in the high risks, are by using the result-oriented management and proactive financial management. Apart from this, real estate developers must periodically follow-up and evaluate the risks continuously during every phrase of the construction.","PeriodicalId":210981,"journal":{"name":"Corporate Governance: Social Responsibility & Social Impact eJournal","volume":"43 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-05-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Identifying and Analyzing Risks in the Construction of High Rise Buildings Along the Sky Train Rails in Bangkok\",\"authors\":\"Vichian Puncreobutr, Vipa Pengsa-ium, Yongyut Khamkhong, Tanit Kriengsantikul\",\"doi\":\"10.2139/ssrn.3179360\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The research on Identifying and Analyzing Risk in the Construction of High Rise Buildings Along the Sky Train Rails in Bangkok has the objective of studying the risk factors, guidelines for the prevention and rectification of the risks in the construction of high rise buildings along the Sky train rails in Bangkok. The sample group consisted of those involved in the 6 developing projects of high rise building construction along the Sky train rails in Bangkok. Information collected from in-depth interviews, Analyzed results with risk assessment techniques and content analysis techniques. It is found from the study that the risk factors arose are both from internally and externally. That the highest risks occurred in every phrase of the construction, from the designing phrase to the post construction phrase. It is also found that the guidelines in preventing and rectification of risks, especially in the high risks, are by using the result-oriented management and proactive financial management. Apart from this, real estate developers must periodically follow-up and evaluate the risks continuously during every phrase of the construction.\",\"PeriodicalId\":210981,\"journal\":{\"name\":\"Corporate Governance: Social Responsibility & Social Impact eJournal\",\"volume\":\"43 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-05-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Corporate Governance: Social Responsibility & Social Impact eJournal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.3179360\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Corporate Governance: Social Responsibility & Social Impact eJournal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.3179360","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Identifying and Analyzing Risks in the Construction of High Rise Buildings Along the Sky Train Rails in Bangkok
The research on Identifying and Analyzing Risk in the Construction of High Rise Buildings Along the Sky Train Rails in Bangkok has the objective of studying the risk factors, guidelines for the prevention and rectification of the risks in the construction of high rise buildings along the Sky train rails in Bangkok. The sample group consisted of those involved in the 6 developing projects of high rise building construction along the Sky train rails in Bangkok. Information collected from in-depth interviews, Analyzed results with risk assessment techniques and content analysis techniques. It is found from the study that the risk factors arose are both from internally and externally. That the highest risks occurred in every phrase of the construction, from the designing phrase to the post construction phrase. It is also found that the guidelines in preventing and rectification of risks, especially in the high risks, are by using the result-oriented management and proactive financial management. Apart from this, real estate developers must periodically follow-up and evaluate the risks continuously during every phrase of the construction.