曼谷轻轨沿线高层建筑施工风险识别与分析

Vichian Puncreobutr, Vipa Pengsa-ium, Yongyut Khamkhong, Tanit Kriengsantikul
{"title":"曼谷轻轨沿线高层建筑施工风险识别与分析","authors":"Vichian Puncreobutr, Vipa Pengsa-ium, Yongyut Khamkhong, Tanit Kriengsantikul","doi":"10.2139/ssrn.3179360","DOIUrl":null,"url":null,"abstract":"The research on Identifying and Analyzing Risk in the Construction of High Rise Buildings Along the Sky Train Rails in Bangkok has the objective of studying the risk factors, guidelines for the prevention and rectification of the risks in the construction of high rise buildings along the Sky train rails in Bangkok. The sample group consisted of those involved in the 6 developing projects of high rise building construction along the Sky train rails in Bangkok. Information collected from in-depth interviews, Analyzed results with risk assessment techniques and content analysis techniques. It is found from the study that the risk factors arose are both from internally and externally. That the highest risks occurred in every phrase of the construction, from the designing phrase to the post construction phrase. It is also found that the guidelines in preventing and rectification of risks, especially in the high risks, are by using the result-oriented management and proactive financial management. Apart from this, real estate developers must periodically follow-up and evaluate the risks continuously during every phrase of the construction.","PeriodicalId":210981,"journal":{"name":"Corporate Governance: Social Responsibility & Social Impact eJournal","volume":"43 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-05-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Identifying and Analyzing Risks in the Construction of High Rise Buildings Along the Sky Train Rails in Bangkok\",\"authors\":\"Vichian Puncreobutr, Vipa Pengsa-ium, Yongyut Khamkhong, Tanit Kriengsantikul\",\"doi\":\"10.2139/ssrn.3179360\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The research on Identifying and Analyzing Risk in the Construction of High Rise Buildings Along the Sky Train Rails in Bangkok has the objective of studying the risk factors, guidelines for the prevention and rectification of the risks in the construction of high rise buildings along the Sky train rails in Bangkok. The sample group consisted of those involved in the 6 developing projects of high rise building construction along the Sky train rails in Bangkok. Information collected from in-depth interviews, Analyzed results with risk assessment techniques and content analysis techniques. It is found from the study that the risk factors arose are both from internally and externally. That the highest risks occurred in every phrase of the construction, from the designing phrase to the post construction phrase. It is also found that the guidelines in preventing and rectification of risks, especially in the high risks, are by using the result-oriented management and proactive financial management. Apart from this, real estate developers must periodically follow-up and evaluate the risks continuously during every phrase of the construction.\",\"PeriodicalId\":210981,\"journal\":{\"name\":\"Corporate Governance: Social Responsibility & Social Impact eJournal\",\"volume\":\"43 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-05-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Corporate Governance: Social Responsibility & Social Impact eJournal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.3179360\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Corporate Governance: Social Responsibility & Social Impact eJournal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.3179360","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

曼谷空轨高层建筑施工风险识别与分析研究的目的是研究曼谷空轨高层建筑施工的风险因素,为预防和纠正风险提供指导。样本组包括参与曼谷空中列车沿线6个高层建筑建设开发项目的人员。从深度访谈中收集信息,使用风险评估技术和内容分析技术分析结果。研究发现,产生的危险因素既有内部因素,也有外部因素。从设计阶段到施工后期,施工的每个阶段都存在着最高的风险。研究还发现,防范和整治风险,特别是高风险风险的指导方针是运用结果导向管理和积极主动的财务管理。除此之外,房地产开发商必须在建设的每个阶段定期跟踪和持续评估风险。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Identifying and Analyzing Risks in the Construction of High Rise Buildings Along the Sky Train Rails in Bangkok
The research on Identifying and Analyzing Risk in the Construction of High Rise Buildings Along the Sky Train Rails in Bangkok has the objective of studying the risk factors, guidelines for the prevention and rectification of the risks in the construction of high rise buildings along the Sky train rails in Bangkok. The sample group consisted of those involved in the 6 developing projects of high rise building construction along the Sky train rails in Bangkok. Information collected from in-depth interviews, Analyzed results with risk assessment techniques and content analysis techniques. It is found from the study that the risk factors arose are both from internally and externally. That the highest risks occurred in every phrase of the construction, from the designing phrase to the post construction phrase. It is also found that the guidelines in preventing and rectification of risks, especially in the high risks, are by using the result-oriented management and proactive financial management. Apart from this, real estate developers must periodically follow-up and evaluate the risks continuously during every phrase of the construction.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
CEO Pay Ratio Estimation under Social Pressure Strategic Leadership in Corporate Social Responsibility Does CSR Engender Trust? Evidence From Investor Reactions to Corporate Disclosures Tax Planning Knowledge Diffusion via the Labor Market Corporate Flexibility in a Time of Crisis
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1