{"title":"小井眼同时分段作业和三个开发地点同时分段作业的应用效果与展望","authors":"A. Yakovlev","doi":"10.2118/201900-ms","DOIUrl":null,"url":null,"abstract":"\n This paper describes the results of application and prospects for the further implementation of simultaneous-separate operation equipment in slim hole wells and simultaneous-separate operation equipment for three development locations in wells of Territorial production enterprise «TatRITEKneft».","PeriodicalId":359083,"journal":{"name":"Day 2 Tue, October 27, 2020","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Summary of Application Results and Prospects for the Further Implementation of Simultaneous-Separate Operation in Slim Hole Wells and Simultaneous-Separate Operation for Three Development Locations\",\"authors\":\"A. Yakovlev\",\"doi\":\"10.2118/201900-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This paper describes the results of application and prospects for the further implementation of simultaneous-separate operation equipment in slim hole wells and simultaneous-separate operation equipment for three development locations in wells of Territorial production enterprise «TatRITEKneft».\",\"PeriodicalId\":359083,\"journal\":{\"name\":\"Day 2 Tue, October 27, 2020\",\"volume\":\"11 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, October 27, 2020\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/201900-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, October 27, 2020","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/201900-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Summary of Application Results and Prospects for the Further Implementation of Simultaneous-Separate Operation in Slim Hole Wells and Simultaneous-Separate Operation for Three Development Locations
This paper describes the results of application and prospects for the further implementation of simultaneous-separate operation equipment in slim hole wells and simultaneous-separate operation equipment for three development locations in wells of Territorial production enterprise «TatRITEKneft».