{"title":"基于BIM和VR的市政公用隧道设施管理的发展与应用","authors":"Chih-ming Wu, Lin-Yan Li, Yingyi Lai, Celia Xiao","doi":"10.1109/ECICE50847.2020.9301916","DOIUrl":null,"url":null,"abstract":"This study integrates the Building Information Modeling (BIM) technology and Virtual Reality (VR) technology to construct a three-dimensional visualization application scenario of facility management in the operation phase of the utility tunnel, then able to conduct analysis test and obtain experience of operation and maintenance system in advance. Through the municipal utility tunnel VR visualization scene, the fire alarm system of utility tunnel is tested and implemented.","PeriodicalId":130143,"journal":{"name":"2020 IEEE Eurasia Conference on IOT, Communication and Engineering (ECICE)","volume":"146 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Development and Application of Municipal Utility Tunnel Facility Management Based on BIM and VR\",\"authors\":\"Chih-ming Wu, Lin-Yan Li, Yingyi Lai, Celia Xiao\",\"doi\":\"10.1109/ECICE50847.2020.9301916\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study integrates the Building Information Modeling (BIM) technology and Virtual Reality (VR) technology to construct a three-dimensional visualization application scenario of facility management in the operation phase of the utility tunnel, then able to conduct analysis test and obtain experience of operation and maintenance system in advance. Through the municipal utility tunnel VR visualization scene, the fire alarm system of utility tunnel is tested and implemented.\",\"PeriodicalId\":130143,\"journal\":{\"name\":\"2020 IEEE Eurasia Conference on IOT, Communication and Engineering (ECICE)\",\"volume\":\"146 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 IEEE Eurasia Conference on IOT, Communication and Engineering (ECICE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ECICE50847.2020.9301916\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE Eurasia Conference on IOT, Communication and Engineering (ECICE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ECICE50847.2020.9301916","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Development and Application of Municipal Utility Tunnel Facility Management Based on BIM and VR
This study integrates the Building Information Modeling (BIM) technology and Virtual Reality (VR) technology to construct a three-dimensional visualization application scenario of facility management in the operation phase of the utility tunnel, then able to conduct analysis test and obtain experience of operation and maintenance system in advance. Through the municipal utility tunnel VR visualization scene, the fire alarm system of utility tunnel is tested and implemented.