{"title":"PJM电力市场输电投资激励:ftr还是监管(或两者兼而有之?)","authors":"Juan Rosellón, Zdenka Myslikova, Eric Zenón","doi":"10.2139/ssrn.1640546","DOIUrl":null,"url":null,"abstract":"This paper presents an application of a mechanism that provides incentives to promote transmission network expansion in the area of the US electric system known as PJM. The applied mechanism combines the merchant and regulatory approaches to attract investment into transmission grids. It is based on rebalancing a two-part tariff in the framework of a wholesale electricity market with locational pricing. The expansion of the network is carried out through the sale of financial transmission rights for the congested lines. The mechanism is tested for 14-node and 17-node geographical coverage areas of PJM. Under Laspeyres weights, it is shown that prices converge to the marginal cost of generation, the congestion rent decreases, and the total social welfare increases. The mechanism is shown to adjust prices effectively given either non-peak or peak demand.","PeriodicalId":432405,"journal":{"name":"Transportation Science eJournal","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"40","resultStr":"{\"title\":\"Incentives for Transmission Investment in the PJM Electricity Market: FTRs or Regulation (or Both?)\",\"authors\":\"Juan Rosellón, Zdenka Myslikova, Eric Zenón\",\"doi\":\"10.2139/ssrn.1640546\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents an application of a mechanism that provides incentives to promote transmission network expansion in the area of the US electric system known as PJM. The applied mechanism combines the merchant and regulatory approaches to attract investment into transmission grids. It is based on rebalancing a two-part tariff in the framework of a wholesale electricity market with locational pricing. The expansion of the network is carried out through the sale of financial transmission rights for the congested lines. The mechanism is tested for 14-node and 17-node geographical coverage areas of PJM. Under Laspeyres weights, it is shown that prices converge to the marginal cost of generation, the congestion rent decreases, and the total social welfare increases. The mechanism is shown to adjust prices effectively given either non-peak or peak demand.\",\"PeriodicalId\":432405,\"journal\":{\"name\":\"Transportation Science eJournal\",\"volume\":\"17 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"40\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Transportation Science eJournal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.1640546\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transportation Science eJournal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.1640546","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 40

摘要

本文介绍了一种机制的应用,该机制提供激励,以促进美国电力系统中被称为PJM的输电网络扩展。应用的机制结合了商业和监管方法来吸引对输电网的投资。它的基础是在批发电力市场框架内重新平衡两部分电价,并采用地点定价。该网络的扩张是通过出售拥堵线路的金融传输权来实现的。该机制在PJM的14节点和17节点地理覆盖区域进行了测试。在Laspeyres权值下,电价收敛于边际发电成本,拥堵租金降低,社会总福利增加。该机制被证明在非峰值或峰值需求下都能有效地调整价格。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Incentives for Transmission Investment in the PJM Electricity Market: FTRs or Regulation (or Both?)
This paper presents an application of a mechanism that provides incentives to promote transmission network expansion in the area of the US electric system known as PJM. The applied mechanism combines the merchant and regulatory approaches to attract investment into transmission grids. It is based on rebalancing a two-part tariff in the framework of a wholesale electricity market with locational pricing. The expansion of the network is carried out through the sale of financial transmission rights for the congested lines. The mechanism is tested for 14-node and 17-node geographical coverage areas of PJM. Under Laspeyres weights, it is shown that prices converge to the marginal cost of generation, the congestion rent decreases, and the total social welfare increases. The mechanism is shown to adjust prices effectively given either non-peak or peak demand.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
In the Driver’s Seat: The Role of Transformational Leadership in Safe and Productive Truck Cargo Transport Smart Navigation via Strategic Communications in a Mixed Autonomous Paradigm Perception vs. Reality: The Aviation Noise Complaint Effect on Home Prices Airport Dominance, Route Network Design and Flight Delays Brazilian Railways Relations of Production Density, Scale, Scope and Efficiency
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1