印尼中压负载分断开关故障案例分析

N. W. Priambodo, H. B. Tambunan, B. Harsono, P. Pramana, A. A. Kusuma
{"title":"印尼中压负载分断开关故障案例分析","authors":"N. W. Priambodo, H. B. Tambunan, B. Harsono, P. Pramana, A. A. Kusuma","doi":"10.1109/ICITISEE.2018.8720997","DOIUrl":null,"url":null,"abstract":"One of load break switch (LBS) cubical had been burn in Jakarta area. This study was performed to gain a root cause of the failure based on field data and the simulation program. Historical recorded data from relay showed the occurred phenomena during the disturbance. Some hypotheses were built from that relay data. Furthermore, to ensure the hypotheses, simulation was conducted by modelling the system and considering recorded data from relay. According to the field data and simulation, it was found that the cause of the SF6 LBS failure was arcing on one of the loose contacts. Arcing lead phase to ground fault. Arcing lasted for a long time because the fire extinguisher ability of SF6 had degraded. This made the pressure in chamber rise then the explosion was occurred which caused three phases to ground fault in LBS.","PeriodicalId":180051,"journal":{"name":"2018 3rd International Conference on Information Technology, Information System and Electrical Engineering (ICITISEE)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Case Study of Medium Voltage Load Break Switch Failure in Indonesia\",\"authors\":\"N. W. Priambodo, H. B. Tambunan, B. Harsono, P. Pramana, A. A. Kusuma\",\"doi\":\"10.1109/ICITISEE.2018.8720997\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"One of load break switch (LBS) cubical had been burn in Jakarta area. This study was performed to gain a root cause of the failure based on field data and the simulation program. Historical recorded data from relay showed the occurred phenomena during the disturbance. Some hypotheses were built from that relay data. Furthermore, to ensure the hypotheses, simulation was conducted by modelling the system and considering recorded data from relay. According to the field data and simulation, it was found that the cause of the SF6 LBS failure was arcing on one of the loose contacts. Arcing lead phase to ground fault. Arcing lasted for a long time because the fire extinguisher ability of SF6 had degraded. This made the pressure in chamber rise then the explosion was occurred which caused three phases to ground fault in LBS.\",\"PeriodicalId\":180051,\"journal\":{\"name\":\"2018 3rd International Conference on Information Technology, Information System and Electrical Engineering (ICITISEE)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 3rd International Conference on Information Technology, Information System and Electrical Engineering (ICITISEE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICITISEE.2018.8720997\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 3rd International Conference on Information Technology, Information System and Electrical Engineering (ICITISEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICITISEE.2018.8720997","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

在雅加达地区,一个负载断开开关(LBS)立方体被烧毁。这项研究是为了根据现场数据和模拟程序获得故障的根本原因。继电器的历史记录数据显示了扰动期间发生的现象。一些假设建立在中继数据之上。此外,为了验证假设,通过对系统建模并考虑继电器的记录数据进行了仿真。根据现场数据和仿真分析,发现SF6 LBS失效的原因是其中一个松动触点发生电弧。引弧相接地故障。电弧持续时间较长是由于SF6的灭火能力下降所致。这使得腔内压力升高,发生爆炸,造成LBS三相接地故障。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Case Study of Medium Voltage Load Break Switch Failure in Indonesia
One of load break switch (LBS) cubical had been burn in Jakarta area. This study was performed to gain a root cause of the failure based on field data and the simulation program. Historical recorded data from relay showed the occurred phenomena during the disturbance. Some hypotheses were built from that relay data. Furthermore, to ensure the hypotheses, simulation was conducted by modelling the system and considering recorded data from relay. According to the field data and simulation, it was found that the cause of the SF6 LBS failure was arcing on one of the loose contacts. Arcing lead phase to ground fault. Arcing lasted for a long time because the fire extinguisher ability of SF6 had degraded. This made the pressure in chamber rise then the explosion was occurred which caused three phases to ground fault in LBS.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Class Diagram Similarity Measurement: A Different Approach Implementation of QR Code and Imei on Android and Web-Based Student Presence Systems Robustness Analysis of PI Controller to Constant Output Power with Dynamic Load Condition in DC Nanogrid System Indonesian Sign Language Recognition Application For Two-Way Communication Deaf-Mute People Comparison Study of Deep Learning and Time Series for Bioelectric Potential Analysis
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1