{"title":"印尼中压负载分断开关故障案例分析","authors":"N. W. Priambodo, H. B. Tambunan, B. Harsono, P. Pramana, A. A. Kusuma","doi":"10.1109/ICITISEE.2018.8720997","DOIUrl":null,"url":null,"abstract":"One of load break switch (LBS) cubical had been burn in Jakarta area. This study was performed to gain a root cause of the failure based on field data and the simulation program. Historical recorded data from relay showed the occurred phenomena during the disturbance. Some hypotheses were built from that relay data. Furthermore, to ensure the hypotheses, simulation was conducted by modelling the system and considering recorded data from relay. According to the field data and simulation, it was found that the cause of the SF6 LBS failure was arcing on one of the loose contacts. Arcing lead phase to ground fault. Arcing lasted for a long time because the fire extinguisher ability of SF6 had degraded. This made the pressure in chamber rise then the explosion was occurred which caused three phases to ground fault in LBS.","PeriodicalId":180051,"journal":{"name":"2018 3rd International Conference on Information Technology, Information System and Electrical Engineering (ICITISEE)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Case Study of Medium Voltage Load Break Switch Failure in Indonesia\",\"authors\":\"N. W. Priambodo, H. B. Tambunan, B. Harsono, P. Pramana, A. A. Kusuma\",\"doi\":\"10.1109/ICITISEE.2018.8720997\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"One of load break switch (LBS) cubical had been burn in Jakarta area. This study was performed to gain a root cause of the failure based on field data and the simulation program. Historical recorded data from relay showed the occurred phenomena during the disturbance. Some hypotheses were built from that relay data. Furthermore, to ensure the hypotheses, simulation was conducted by modelling the system and considering recorded data from relay. According to the field data and simulation, it was found that the cause of the SF6 LBS failure was arcing on one of the loose contacts. Arcing lead phase to ground fault. Arcing lasted for a long time because the fire extinguisher ability of SF6 had degraded. This made the pressure in chamber rise then the explosion was occurred which caused three phases to ground fault in LBS.\",\"PeriodicalId\":180051,\"journal\":{\"name\":\"2018 3rd International Conference on Information Technology, Information System and Electrical Engineering (ICITISEE)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 3rd International Conference on Information Technology, Information System and Electrical Engineering (ICITISEE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICITISEE.2018.8720997\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 3rd International Conference on Information Technology, Information System and Electrical Engineering (ICITISEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICITISEE.2018.8720997","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Case Study of Medium Voltage Load Break Switch Failure in Indonesia
One of load break switch (LBS) cubical had been burn in Jakarta area. This study was performed to gain a root cause of the failure based on field data and the simulation program. Historical recorded data from relay showed the occurred phenomena during the disturbance. Some hypotheses were built from that relay data. Furthermore, to ensure the hypotheses, simulation was conducted by modelling the system and considering recorded data from relay. According to the field data and simulation, it was found that the cause of the SF6 LBS failure was arcing on one of the loose contacts. Arcing lead phase to ground fault. Arcing lasted for a long time because the fire extinguisher ability of SF6 had degraded. This made the pressure in chamber rise then the explosion was occurred which caused three phases to ground fault in LBS.