{"title":"个人防护接地的注意事项","authors":"J. R. White, S. Jamil","doi":"10.1109/PCICON.2014.6961891","DOIUrl":null,"url":null,"abstract":"Temporary protective grounding serves a critical safety function when working on electrical power systems. Although many field service personnel are well-familiar with the requirements of using temporary protective grounds, many others have only a partial understanding of important aspects of it. This paper reviews the more important aspects of the application of temporary protective grounds, including sizing, order of placement and removal, results of misapplication and common rules for working with temporary protective grounds.","PeriodicalId":264800,"journal":{"name":"2014 IEEE Petroleum and Chemical Industry Technical Conference (PCIC)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2014-11-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Do's and don'ts of personal protective grounding\",\"authors\":\"J. R. White, S. Jamil\",\"doi\":\"10.1109/PCICON.2014.6961891\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Temporary protective grounding serves a critical safety function when working on electrical power systems. Although many field service personnel are well-familiar with the requirements of using temporary protective grounds, many others have only a partial understanding of important aspects of it. This paper reviews the more important aspects of the application of temporary protective grounds, including sizing, order of placement and removal, results of misapplication and common rules for working with temporary protective grounds.\",\"PeriodicalId\":264800,\"journal\":{\"name\":\"2014 IEEE Petroleum and Chemical Industry Technical Conference (PCIC)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-11-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 IEEE Petroleum and Chemical Industry Technical Conference (PCIC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PCICON.2014.6961891\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE Petroleum and Chemical Industry Technical Conference (PCIC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PCICON.2014.6961891","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

在电力系统工作时,临时保护接地起着至关重要的安全作用。虽然许多外勤服务人员非常熟悉使用临时保护地的要求,但许多其他人对它的重要方面只有部分了解。本文综述了临时保护地应用的重要方面,包括大小、放置和移除的顺序、误用的结果以及使用临时保护地的一般规则。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Do's and don'ts of personal protective grounding
Temporary protective grounding serves a critical safety function when working on electrical power systems. Although many field service personnel are well-familiar with the requirements of using temporary protective grounds, many others have only a partial understanding of important aspects of it. This paper reviews the more important aspects of the application of temporary protective grounds, including sizing, order of placement and removal, results of misapplication and common rules for working with temporary protective grounds.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
MV-105 cable - Field acceptance testing - A cable manufacturer's perspective The impact voltage and frequency variations have on squirrel cage induction motors Transforming partial discharge data in volts and coulombs for six high-voltage motors Arc flash considering generator decrement curves Pre-emptive arc fault detection techniques in switchgear-part III, from the laboratory to practical installation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1