在具有通信延迟和节点执行复制的并行系统上调度计算日

P. Markenscoff, Yong Yuan Li
{"title":"在具有通信延迟和节点执行复制的并行系统上调度计算日","authors":"P. Markenscoff, Yong Yuan Li","doi":"10.1109/IPPS.1993.262865","DOIUrl":null,"url":null,"abstract":"The authors consider the problem of optimally scheduling the subtasks of a computational task modeled by a dag (directed acyclic graph) on parallel systems with identical processors. Execution of the subtasks (nodes) must satisfy precedence constraints that are met via data exchanges among processors which introduce communication delays. The optimization criterion used is the minimization of the processing time and the authors assume that there is no restriction on the number of processors needed and that a node may be replicated. They prove that the optimal scheduling problem can be solved in polynomial amount of time when the computational graph is a two-level dag. For a general dag they develop an algorithm that significantly reduces the search space over exhaustive search and can work very fast in many cases (the problem is NP-complete).<<ETX>>","PeriodicalId":248927,"journal":{"name":"[1993] Proceedings Seventh International Parallel Processing Symposium","volume":"37 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-04-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"Scheduling a computational dag on a parallel system with communication delays and replication of node execution\",\"authors\":\"P. Markenscoff, Yong Yuan Li\",\"doi\":\"10.1109/IPPS.1993.262865\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The authors consider the problem of optimally scheduling the subtasks of a computational task modeled by a dag (directed acyclic graph) on parallel systems with identical processors. Execution of the subtasks (nodes) must satisfy precedence constraints that are met via data exchanges among processors which introduce communication delays. The optimization criterion used is the minimization of the processing time and the authors assume that there is no restriction on the number of processors needed and that a node may be replicated. They prove that the optimal scheduling problem can be solved in polynomial amount of time when the computational graph is a two-level dag. For a general dag they develop an algorithm that significantly reduces the search space over exhaustive search and can work very fast in many cases (the problem is NP-complete).<<ETX>>\",\"PeriodicalId\":248927,\"journal\":{\"name\":\"[1993] Proceedings Seventh International Parallel Processing Symposium\",\"volume\":\"37 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1993-04-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"[1993] Proceedings Seventh International Parallel Processing Symposium\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IPPS.1993.262865\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"[1993] Proceedings Seventh International Parallel Processing Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IPPS.1993.262865","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

摘要

研究了在具有相同处理器的并行系统上,以dag(有向无环图)为模型的计算任务的子任务的最优调度问题。子任务(节点)的执行必须满足优先级约束,这些约束通过处理器之间的数据交换来满足,从而引入通信延迟。使用的优化标准是处理时间的最小化,作者假设对所需的处理器数量没有限制,并且可以复制节点。他们证明了当计算图是一个两层日时,最优调度问题可以在多项式时间内得到解决。一般来说,他们开发了一种算法,该算法大大减少了穷举搜索的搜索空间,并且在许多情况下(问题是np完全的)可以非常快地工作。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Scheduling a computational dag on a parallel system with communication delays and replication of node execution
The authors consider the problem of optimally scheduling the subtasks of a computational task modeled by a dag (directed acyclic graph) on parallel systems with identical processors. Execution of the subtasks (nodes) must satisfy precedence constraints that are met via data exchanges among processors which introduce communication delays. The optimization criterion used is the minimization of the processing time and the authors assume that there is no restriction on the number of processors needed and that a node may be replicated. They prove that the optimal scheduling problem can be solved in polynomial amount of time when the computational graph is a two-level dag. For a general dag they develop an algorithm that significantly reduces the search space over exhaustive search and can work very fast in many cases (the problem is NP-complete).<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Mapping realistic data sets on parallel computers A cluster-M based mapping methodology Supporting insertions and deletions in striped parallel filesystems An efficient atomic multicast protocol for client-server models Implementation of distributed asynchronous algorithms with stochastic delays for solving time drifting optimization problems
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1