{"title":"通过船舶生产/维修的智能调度减少项目工期","authors":"R. Richards","doi":"10.5957/smc-2022-055","DOIUrl":null,"url":null,"abstract":"Ship and submarine production and repair have benefited significantly from more intelligently allocating resources and managing other constraints, thereby increasing efficiency, and reducing overall project duration. In complex production and repair environments, such as ship production/repair, the method of allocating resources and managing other constraints significantly affects the efficiency of progress and thus the overall project duration. Resources include human resources, equipment resources and physical-space resources. Due to the inherent complexity of resource allocation and constraint management for such complex environments, the project durations can be 25%+ longer than necessary. This paper shares the real-world results experienced by the authors as well as similar results found in the literature showing the major difference in project duration due to resource-scheduling techniques.","PeriodicalId":336268,"journal":{"name":"Day 2 Wed, September 28, 2022","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Reduced Project Duration via Intelligent Scheduling for Ship Production/Repair\",\"authors\":\"R. Richards\",\"doi\":\"10.5957/smc-2022-055\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Ship and submarine production and repair have benefited significantly from more intelligently allocating resources and managing other constraints, thereby increasing efficiency, and reducing overall project duration. In complex production and repair environments, such as ship production/repair, the method of allocating resources and managing other constraints significantly affects the efficiency of progress and thus the overall project duration. Resources include human resources, equipment resources and physical-space resources. Due to the inherent complexity of resource allocation and constraint management for such complex environments, the project durations can be 25%+ longer than necessary. This paper shares the real-world results experienced by the authors as well as similar results found in the literature showing the major difference in project duration due to resource-scheduling techniques.\",\"PeriodicalId\":336268,\"journal\":{\"name\":\"Day 2 Wed, September 28, 2022\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-09-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Wed, September 28, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5957/smc-2022-055\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, September 28, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5957/smc-2022-055","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Reduced Project Duration via Intelligent Scheduling for Ship Production/Repair
Ship and submarine production and repair have benefited significantly from more intelligently allocating resources and managing other constraints, thereby increasing efficiency, and reducing overall project duration. In complex production and repair environments, such as ship production/repair, the method of allocating resources and managing other constraints significantly affects the efficiency of progress and thus the overall project duration. Resources include human resources, equipment resources and physical-space resources. Due to the inherent complexity of resource allocation and constraint management for such complex environments, the project durations can be 25%+ longer than necessary. This paper shares the real-world results experienced by the authors as well as similar results found in the literature showing the major difference in project duration due to resource-scheduling techniques.