CMMI-ACQ:成熟度级别2的过程域的正式实现序列

J. Calvo-Manzano, G. Cuevas, J. Mejía, T. San Feliu, A. Sánchez
{"title":"CMMI-ACQ:成熟度级别2的过程域的正式实现序列","authors":"J. Calvo-Manzano, G. Cuevas, J. Mejía, T. San Feliu, A. Sánchez","doi":"10.1109/CERMA.2008.55","DOIUrl":null,"url":null,"abstract":"Nowadays, the information technology outsourcing is having a fast growth worldwide. However, according to recent studies, 20 to 25 percent of large IT acquisition projects fail within two years and 50 percent fail within five years. CMMI-ACQ is a model that provides guidance to organizations on the acquisition of software products and related services. This paper addresses an implementation sequence of the processes areas at maturity level 2. To achieve this objective, graphs theory is used to represent the existing dependencies among CMMI-ACQ processes areas, in order to find strongly connected cluster and cyclic processes areas. These clusters using formal criteria have helped to determine the implementation sequences of the acquisition processes areas at maturity level 2.","PeriodicalId":126172,"journal":{"name":"2008 Electronics, Robotics and Automotive Mechanics Conference (CERMA '08)","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"CMMI-ACQ: A Formal Implementation Sequences of the Processes Areas at Maturity Level 2\",\"authors\":\"J. Calvo-Manzano, G. Cuevas, J. Mejía, T. San Feliu, A. Sánchez\",\"doi\":\"10.1109/CERMA.2008.55\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Nowadays, the information technology outsourcing is having a fast growth worldwide. However, according to recent studies, 20 to 25 percent of large IT acquisition projects fail within two years and 50 percent fail within five years. CMMI-ACQ is a model that provides guidance to organizations on the acquisition of software products and related services. This paper addresses an implementation sequence of the processes areas at maturity level 2. To achieve this objective, graphs theory is used to represent the existing dependencies among CMMI-ACQ processes areas, in order to find strongly connected cluster and cyclic processes areas. These clusters using formal criteria have helped to determine the implementation sequences of the acquisition processes areas at maturity level 2.\",\"PeriodicalId\":126172,\"journal\":{\"name\":\"2008 Electronics, Robotics and Automotive Mechanics Conference (CERMA '08)\",\"volume\":\"36 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-09-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 Electronics, Robotics and Automotive Mechanics Conference (CERMA '08)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CERMA.2008.55\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 Electronics, Robotics and Automotive Mechanics Conference (CERMA '08)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CERMA.2008.55","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

当前,信息技术外包在全球范围内发展迅速。然而,根据最近的研究,20%到25%的大型IT收购项目在两年内失败,50%在五年内失败。CMMI-ACQ是一个模型,它为组织获取软件产品和相关服务提供指导。本文讨论了成熟度级别2的过程域的实现顺序。为了实现这一目标,利用图论来表示CMMI-ACQ过程域之间存在的依赖关系,以找到强连接的聚类和循环过程域。这些使用正式标准的集群有助于确定成熟度级别2的获取过程领域的实现顺序。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
CMMI-ACQ: A Formal Implementation Sequences of the Processes Areas at Maturity Level 2
Nowadays, the information technology outsourcing is having a fast growth worldwide. However, according to recent studies, 20 to 25 percent of large IT acquisition projects fail within two years and 50 percent fail within five years. CMMI-ACQ is a model that provides guidance to organizations on the acquisition of software products and related services. This paper addresses an implementation sequence of the processes areas at maturity level 2. To achieve this objective, graphs theory is used to represent the existing dependencies among CMMI-ACQ processes areas, in order to find strongly connected cluster and cyclic processes areas. These clusters using formal criteria have helped to determine the implementation sequences of the acquisition processes areas at maturity level 2.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Modeling a Vehicle Using Bond Graphs The Laplacian Artificial Potential Field (LAPF) for the Path Planning of Robotic Manipulators Cooperative Adaptive Behavior Acquisition in Mobile Robot Swarms Using Neural Networks and Genetic Algorithms Design and Construction of an EEG Data Acquisition System for Measurement of Auditory Evoked Potentials Proposal for a Remote Surgery System Based on Wireless Communications, Electromyography and Robotics
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1