{"title":"MW-Mile法在马来西亚电力系统输电成本分摊中的比较分析","authors":"M.Z. Meah, A. Mohamed, S. Serwan","doi":"10.1109/PECON.2003.1437478","DOIUrl":null,"url":null,"abstract":"One of key issues of electricity supply industry restructuring and deregulation is transmission access pricing. Transmission access pricing must be nondiscriminatory, transparent, economically efficient, and allow full recovery of costs. In the case of electricity transmission system, economic efficiency implies promoting an optimal utilisation of existing network, efficient siting of new generations and loads and promoting transmission investments. These characteristics require that the transmission circuits that pertain to each transaction must be identified and their costs properly allocated among users. Therefore, cost allocation is a major issue in transmission access pricing and has given rise to a lot of methodologies. This paper presents an overview of MW-Mile method of transmission cost allocation. Under MW-Mile method there are a number of variants in relation to how the cost of each circuit is allocated to the various users of the circuit. All these various allocations of costs under MW-Mile method categorized as absolute, reverse, dominant and extended methods are tested, compared and analysed using the Malaysian power system in order to assess their impact on the long-term transmission planning. Focus is given to observe which cost allocation method that can provide strong siting signals.","PeriodicalId":136640,"journal":{"name":"Proceedings. National Power Engineering Conference, 2003. PECon 2003.","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2003-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"22","resultStr":"{\"title\":\"Comparative analysis of using MW-Mile methods in transmission cost allocation for the Malaysia power system\",\"authors\":\"M.Z. Meah, A. Mohamed, S. Serwan\",\"doi\":\"10.1109/PECON.2003.1437478\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"One of key issues of electricity supply industry restructuring and deregulation is transmission access pricing. Transmission access pricing must be nondiscriminatory, transparent, economically efficient, and allow full recovery of costs. In the case of electricity transmission system, economic efficiency implies promoting an optimal utilisation of existing network, efficient siting of new generations and loads and promoting transmission investments. These characteristics require that the transmission circuits that pertain to each transaction must be identified and their costs properly allocated among users. Therefore, cost allocation is a major issue in transmission access pricing and has given rise to a lot of methodologies. This paper presents an overview of MW-Mile method of transmission cost allocation. Under MW-Mile method there are a number of variants in relation to how the cost of each circuit is allocated to the various users of the circuit. All these various allocations of costs under MW-Mile method categorized as absolute, reverse, dominant and extended methods are tested, compared and analysed using the Malaysian power system in order to assess their impact on the long-term transmission planning. Focus is given to observe which cost allocation method that can provide strong siting signals.\",\"PeriodicalId\":136640,\"journal\":{\"name\":\"Proceedings. National Power Engineering Conference, 2003. PECon 2003.\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2003-12-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"22\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings. National Power Engineering Conference, 2003. PECon 2003.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PECON.2003.1437478\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings. National Power Engineering Conference, 2003. PECon 2003.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PECON.2003.1437478","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 22

摘要

输电接入价格是供电行业调整和放松管制的关键问题之一。输电接入定价必须是非歧视性的、透明的、经济高效的,并允许完全收回成本。就电力传输系统而言,经济效率意味着促进现有网络的最佳利用,新一代和负荷的有效选址以及促进传输投资。这些特点要求必须确定与每笔交易有关的传输电路,并在用户之间合理分配其费用。因此,成本分配是输电接入定价中的一个主要问题,并产生了许多方法。本文概述了输电成本分摊的兆瓦英里法。在MW-Mile方法下,与如何将每个电路的成本分配给电路的各种用户有关,存在许多变体。在MW-Mile方法下,所有这些不同的成本分配分为绝对、反向、主导和扩展方法,使用马来西亚电力系统进行测试、比较和分析,以评估它们对长期输电规划的影响。重点观察哪一种成本分配方式能提供较强的选址信号。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Comparative analysis of using MW-Mile methods in transmission cost allocation for the Malaysia power system
One of key issues of electricity supply industry restructuring and deregulation is transmission access pricing. Transmission access pricing must be nondiscriminatory, transparent, economically efficient, and allow full recovery of costs. In the case of electricity transmission system, economic efficiency implies promoting an optimal utilisation of existing network, efficient siting of new generations and loads and promoting transmission investments. These characteristics require that the transmission circuits that pertain to each transaction must be identified and their costs properly allocated among users. Therefore, cost allocation is a major issue in transmission access pricing and has given rise to a lot of methodologies. This paper presents an overview of MW-Mile method of transmission cost allocation. Under MW-Mile method there are a number of variants in relation to how the cost of each circuit is allocated to the various users of the circuit. All these various allocations of costs under MW-Mile method categorized as absolute, reverse, dominant and extended methods are tested, compared and analysed using the Malaysian power system in order to assess their impact on the long-term transmission planning. Focus is given to observe which cost allocation method that can provide strong siting signals.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Fabrication and testing of linear electric generator for use with a free-piston engine A hybrid approach for security evaluation and preventive control of power systems Study the effective angle of photovoltaic modules in generating an optimum energy Object oriented sparse linear solver component for power system analysis Current efforts in the management of power frequency electric and magnetic fields in Malaysia
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1