{"title":"展示节省成本、缩短进度等[软件项目管理]","authors":"P. Buitenkant","doi":"10.1109/ELECTR.1996.501206","DOIUrl":null,"url":null,"abstract":"We examine some very specific ways in which a client can realize very dramatic savings, both in schedule and project costs. Bringing in outside resources can either shorten your normal design/development cycle or solve a particularly vexing problem. This allows you, the client to benefit from 4 important considerations: fresh approach by outsider; individual highly skilled in the area of interest; specialised equipment is often made available to the client at little or no cost; and highly motivated to satisfy you, the client.","PeriodicalId":119154,"journal":{"name":"Professional Program Proceedings. ELECTRO '96","volume":"59 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1996-04-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Demonstrate cost savings, schedule shortenings, etc [software project management]\",\"authors\":\"P. Buitenkant\",\"doi\":\"10.1109/ELECTR.1996.501206\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We examine some very specific ways in which a client can realize very dramatic savings, both in schedule and project costs. Bringing in outside resources can either shorten your normal design/development cycle or solve a particularly vexing problem. This allows you, the client to benefit from 4 important considerations: fresh approach by outsider; individual highly skilled in the area of interest; specialised equipment is often made available to the client at little or no cost; and highly motivated to satisfy you, the client.\",\"PeriodicalId\":119154,\"journal\":{\"name\":\"Professional Program Proceedings. ELECTRO '96\",\"volume\":\"59 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1996-04-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Professional Program Proceedings. ELECTRO '96\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ELECTR.1996.501206\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Professional Program Proceedings. ELECTRO '96","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ELECTR.1996.501206","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
We examine some very specific ways in which a client can realize very dramatic savings, both in schedule and project costs. Bringing in outside resources can either shorten your normal design/development cycle or solve a particularly vexing problem. This allows you, the client to benefit from 4 important considerations: fresh approach by outsider; individual highly skilled in the area of interest; specialised equipment is often made available to the client at little or no cost; and highly motivated to satisfy you, the client.