电表检测基础设施建设,过期电表按有效期限进行性能分析

Seok-gon Kim, Chang-ho Park
{"title":"电表检测基础设施建设,过期电表按有效期限进行性能分析","authors":"Seok-gon Kim, Chang-ho Park","doi":"10.1109/TD-ASIA.2009.5356913","DOIUrl":null,"url":null,"abstract":"Function and role of electricity meter is changing significantly along with IT technology development. In North America and Europe area, especially, and major electric power companies in the world, demand for mechanical electricity meter is decreasing while electronic electricity meter implementation is continually increasing. Korea Electric Power Corporation (KEPCO), a Korean electric power company, started full scale introducing electronic electricity meter from 2000. Most of the high voltage electricity meters have been changed with electronic type electricity meter. Mechanical electricity meters work as major part in low voltage currently, but these are expected to be changed with the electronic type electricity meter near future. In relation with this situation, future electricity meter operation and maintenance will be focused to electronic type. This study introduce infrastructure construction for the quality improvement of electricity meters, performance analysis for expired meters based on available period, and investigate possibility of extending its lifetime.","PeriodicalId":131589,"journal":{"name":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Infrastructure construction for meter test and performance analysis for expired meters based on available period\",\"authors\":\"Seok-gon Kim, Chang-ho Park\",\"doi\":\"10.1109/TD-ASIA.2009.5356913\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Function and role of electricity meter is changing significantly along with IT technology development. In North America and Europe area, especially, and major electric power companies in the world, demand for mechanical electricity meter is decreasing while electronic electricity meter implementation is continually increasing. Korea Electric Power Corporation (KEPCO), a Korean electric power company, started full scale introducing electronic electricity meter from 2000. Most of the high voltage electricity meters have been changed with electronic type electricity meter. Mechanical electricity meters work as major part in low voltage currently, but these are expected to be changed with the electronic type electricity meter near future. In relation with this situation, future electricity meter operation and maintenance will be focused to electronic type. This study introduce infrastructure construction for the quality improvement of electricity meters, performance analysis for expired meters based on available period, and investigate possibility of extending its lifetime.\",\"PeriodicalId\":131589,\"journal\":{\"name\":\"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific\",\"volume\":\"5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TD-ASIA.2009.5356913\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TD-ASIA.2009.5356913","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

随着信息技术的发展,电表的功能和作用正在发生重大变化。在北美和欧洲地区,特别是世界各大电力公司,机械式电能表的需求正在减少,而电子式电能表的实施却在不断增加。韩国电力公社从2000年开始全面引进电子电表。大部分高压电表已改为电子式电表。目前机械式电能表是低压工作的主要组成部分,但在不久的将来,机械式电能表有望被电子式电能表所取代。针对这种情况,今后电能表的运行维护将以电子式为主。本文介绍了提高电表质量的基础设施建设,对过期电表的使用寿命进行了性能分析,探讨了延长电表使用寿命的可能性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Infrastructure construction for meter test and performance analysis for expired meters based on available period
Function and role of electricity meter is changing significantly along with IT technology development. In North America and Europe area, especially, and major electric power companies in the world, demand for mechanical electricity meter is decreasing while electronic electricity meter implementation is continually increasing. Korea Electric Power Corporation (KEPCO), a Korean electric power company, started full scale introducing electronic electricity meter from 2000. Most of the high voltage electricity meters have been changed with electronic type electricity meter. Mechanical electricity meters work as major part in low voltage currently, but these are expected to be changed with the electronic type electricity meter near future. In relation with this situation, future electricity meter operation and maintenance will be focused to electronic type. This study introduce infrastructure construction for the quality improvement of electricity meters, performance analysis for expired meters based on available period, and investigate possibility of extending its lifetime.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Operational analysis of DC micro-grid using detailed model of distributed generation Real time digital simulator based test system for microgrid management system Case study of customer baseline(CBL) load determination in Korea based on statistical method Assessment of Conditional Value at Risk (CVaR) in transmission investment using Cross Entropy method Governor-response power flow (GRPF) based long-term voltage stability simulation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1