莫斯科市铁路综合体民防掩体全面调查方法

Artem I. Enikeev, Arina S. Katikova, G. Averchenko
{"title":"莫斯科市铁路综合体民防掩体全面调查方法","authors":"Artem I. Enikeev, Arina S. Katikova, G. Averchenko","doi":"10.17816/transsyst2022835-19","DOIUrl":null,"url":null,"abstract":"Background: The security of the state is a priority task in science in modern conditions. Transportation area as one of the most important areas for the state sustainable functioning, requires the special attention. It is very important to research scientific approaches and their implementation for providing security at transport. Due to the large concentration of passengers at station complexes, special attention should be paid to keeping them in working condition. \nVisual inspection of the actual technical condition (full-scale inspection and measurement) of all structural elements (joints, joints of floor slabs, nodes, joints) of a bomb shelter is carried out to identify existing defects, damages and assess their impact on the safety, durability and serviceability of the bomb shelter. \nThe article contains a description of the construction of civil defence underground structures, namely: floor slabs, bomb shelter load-bearing elements, internal waterproofing, and special engineering equipment. The condition of these elements of the bomb shelter at the time of the survey is evaluated, and the existing defects and damages are characterized. The main defects are concrete leaching with exposed reinforcement, cracks and spalling of concrete, lack of modern waterproofing, partial destruction of supporting structures. \nBased on the results, recommendations for further operation of the structure are formulated. And also proposed a set of measures to eliminate existing violations and further exploitation of underground structures. Recommended a set of works to repair the individual components and structures: pasting modern waterproofing materials, the elimination of minor damages to reinforced concrete structures, restoration of the protective layer of concrete to its design values. \nAim: consideration of methods of full-scale examination of bomb shelters, nderground structures and their application; definition of the technical condition of the structure; development of recommendations for further operation. \nMaterials and Methods: As a material and input data, asylum No. 6 in Moscow was analyzed, fixing of defects was carried out. \nThe field method was used as the main one: collection and analysis of preliminary information about the structure, measurement of structures, visual inspection of structures, description of the main defects, establishment of causes, forecast of development and recommendations on elimination of the existing damages. \nThe article puts more emphasis on the visual inspection and assessment of damages: denudation of reinforcement and poor quality waterproofing, leaching of concrete at the points of contact with ground water, corrosion of reinforcement in reinforced concrete, partial collapse of structures, etc. \nResults: As a result of the surveys, a recommendation list was compiled to bring the technical and economic indicators of the structure to the standard state. \nConclusion: according to the results of the survey, it is recommended to perform construction and installation work at the stage of \"Repair\"","PeriodicalId":255036,"journal":{"name":"Modern Transportation Systems and Technologies","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Methods of full-scale survey of shelters of civil defense of railway complexes of the city of Moscow\",\"authors\":\"Artem I. Enikeev, Arina S. Katikova, G. Averchenko\",\"doi\":\"10.17816/transsyst2022835-19\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Background: The security of the state is a priority task in science in modern conditions. Transportation area as one of the most important areas for the state sustainable functioning, requires the special attention. It is very important to research scientific approaches and their implementation for providing security at transport. Due to the large concentration of passengers at station complexes, special attention should be paid to keeping them in working condition. \\nVisual inspection of the actual technical condition (full-scale inspection and measurement) of all structural elements (joints, joints of floor slabs, nodes, joints) of a bomb shelter is carried out to identify existing defects, damages and assess their impact on the safety, durability and serviceability of the bomb shelter. \\nThe article contains a description of the construction of civil defence underground structures, namely: floor slabs, bomb shelter load-bearing elements, internal waterproofing, and special engineering equipment. The condition of these elements of the bomb shelter at the time of the survey is evaluated, and the existing defects and damages are characterized. The main defects are concrete leaching with exposed reinforcement, cracks and spalling of concrete, lack of modern waterproofing, partial destruction of supporting structures. \\nBased on the results, recommendations for further operation of the structure are formulated. And also proposed a set of measures to eliminate existing violations and further exploitation of underground structures. Recommended a set of works to repair the individual components and structures: pasting modern waterproofing materials, the elimination of minor damages to reinforced concrete structures, restoration of the protective layer of concrete to its design values. \\nAim: consideration of methods of full-scale examination of bomb shelters, nderground structures and their application; definition of the technical condition of the structure; development of recommendations for further operation. \\nMaterials and Methods: As a material and input data, asylum No. 6 in Moscow was analyzed, fixing of defects was carried out. \\nThe field method was used as the main one: collection and analysis of preliminary information about the structure, measurement of structures, visual inspection of structures, description of the main defects, establishment of causes, forecast of development and recommendations on elimination of the existing damages. \\nThe article puts more emphasis on the visual inspection and assessment of damages: denudation of reinforcement and poor quality waterproofing, leaching of concrete at the points of contact with ground water, corrosion of reinforcement in reinforced concrete, partial collapse of structures, etc. \\nResults: As a result of the surveys, a recommendation list was compiled to bring the technical and economic indicators of the structure to the standard state. \\nConclusion: according to the results of the survey, it is recommended to perform construction and installation work at the stage of \\\"Repair\\\"\",\"PeriodicalId\":255036,\"journal\":{\"name\":\"Modern Transportation Systems and Technologies\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Modern Transportation Systems and Technologies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17816/transsyst2022835-19\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Modern Transportation Systems and Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17816/transsyst2022835-19","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

背景:国家安全是现代条件下科学的首要任务。交通领域作为国家可持续运行的重要领域之一,需要特别关注。研究提供运输安全的科学方法及其实施是非常重要的。由于车站综合站的客流量较大,应特别注意保持其工作状态。对防空洞的所有结构构件(接缝、楼板接缝、节点、接缝)的实际技术状况进行目视检查(全尺寸检查和测量),以确定存在的缺陷、损害,并评估其对防空洞安全性、耐久性和使用能力的影响。这篇文章描述了地下民防结构的建造,即楼板、防空洞承重构件、内部防水和特殊工程设备。对这些防空洞构件在调查时的状况进行了评估,并对其存在的缺陷和损伤进行了描述。主要缺陷是钢筋外露的混凝土浸出,混凝土裂缝和剥落,缺乏现代防水,支撑结构部分破坏。在此基础上,对该结构的进一步运行提出了建议。并提出了一套措施,以消除现有的违规行为和进一步开采地下结构。推荐了一套修复单个构件和结构的工作:粘贴现代防水材料,消除对钢筋混凝土结构的轻微损伤,将混凝土保护层恢复到设计值。目的:考虑对防空洞、地下结构进行全面检查的方法及其应用;确定结构的技术条件;为进一步行动提出建议。材料与方法:作为材料和输入数据,对莫斯科6号避难所进行分析,对缺陷进行修复。主要采用现场法:收集和分析结构的初步资料,对结构进行测量,对结构进行目视检查,描述主要缺陷,确定原因,预测发展趋势,提出消除现有损害的建议。本文着重介绍了目视检查和损伤评估:钢筋剥蚀和防水质量差,混凝土与地下水接触处的浸出,钢筋混凝土中的钢筋腐蚀,结构部分倒塌等。结果:通过调查,编制了推荐清单,使该结构的技术经济指标达到标准状态。结论:根据调查结果,建议在“修理”阶段进行施工安装工作。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Methods of full-scale survey of shelters of civil defense of railway complexes of the city of Moscow
Background: The security of the state is a priority task in science in modern conditions. Transportation area as one of the most important areas for the state sustainable functioning, requires the special attention. It is very important to research scientific approaches and their implementation for providing security at transport. Due to the large concentration of passengers at station complexes, special attention should be paid to keeping them in working condition. Visual inspection of the actual technical condition (full-scale inspection and measurement) of all structural elements (joints, joints of floor slabs, nodes, joints) of a bomb shelter is carried out to identify existing defects, damages and assess their impact on the safety, durability and serviceability of the bomb shelter. The article contains a description of the construction of civil defence underground structures, namely: floor slabs, bomb shelter load-bearing elements, internal waterproofing, and special engineering equipment. The condition of these elements of the bomb shelter at the time of the survey is evaluated, and the existing defects and damages are characterized. The main defects are concrete leaching with exposed reinforcement, cracks and spalling of concrete, lack of modern waterproofing, partial destruction of supporting structures. Based on the results, recommendations for further operation of the structure are formulated. And also proposed a set of measures to eliminate existing violations and further exploitation of underground structures. Recommended a set of works to repair the individual components and structures: pasting modern waterproofing materials, the elimination of minor damages to reinforced concrete structures, restoration of the protective layer of concrete to its design values. Aim: consideration of methods of full-scale examination of bomb shelters, nderground structures and their application; definition of the technical condition of the structure; development of recommendations for further operation. Materials and Methods: As a material and input data, asylum No. 6 in Moscow was analyzed, fixing of defects was carried out. The field method was used as the main one: collection and analysis of preliminary information about the structure, measurement of structures, visual inspection of structures, description of the main defects, establishment of causes, forecast of development and recommendations on elimination of the existing damages. The article puts more emphasis on the visual inspection and assessment of damages: denudation of reinforcement and poor quality waterproofing, leaching of concrete at the points of contact with ground water, corrosion of reinforcement in reinforced concrete, partial collapse of structures, etc. Results: As a result of the surveys, a recommendation list was compiled to bring the technical and economic indicators of the structure to the standard state. Conclusion: according to the results of the survey, it is recommended to perform construction and installation work at the stage of "Repair"
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Technological processes for ensuring road safety on the roads of St. Petersburg and the Leningrad region Issue of regulating the resistance of the short-circuited winding of the secondary element of a linear induction motor Issues of control of a linear switched reluctance electric drive combining the functions of electric traction and magnetic suspension Process approach to managing a site Railroad repair system Determination of production cost and tariffication of contrailer transportation on railway transport in modern conditions
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1