{"title":"PERENCANAAN ULANG SALURAN DRAINASE KAWASAN JALAN KENDALPAYAK - JALAN SIMPANG PAKISAJI KABUPATEN MALANG","authors":"Ninda Sholeha, U. R. Pudjowati, Agus Suhardono","doi":"10.55404/jos-mrk.2021.02.03.221-226","DOIUrl":null,"url":null,"abstract":"On area Jl. Kendalpayak – Jl.Simpang Pakisaji Malang Regency, inundation often occurs during the rainy season. The occurrence of this flooding is caused by the insufficient capacity of the drainage planning, waste in drainage channels to accommodate the discharge of rainwater runoff, improper drainage planning, waste in drainage channels, the amount of waste from households and the large number of closed drainage channels because they are made for community homes. The purpose of this thesis is to design drainage channels and infiltration wells, calculating construction costs as well as creating scheduling plans for job in the area. The method used in this study was the Log Person Type III with the re-planning for 10 years. The data needed are topographic maps, rainfall data from the closest stations: Kepanjen, Sukun, and Tangkilsari in 2010 until 2019, and the price of the Malang Regency work pricipil in 2020. The calculation results the design rainfall is 107, 33 mm/day; design flood discharge of 2,031m3/second; the infiltrations weels with dimensions of 0,7 meters with depth of 1,7 meters. The drainage channel dimensions are planned by the smallest size of 0,4 m x 0,4 m and the largest size is 1 m x 1 m with construction cost is Rp. 8,581,572,367.92 and the execution time is 18 weeks","PeriodicalId":337938,"journal":{"name":"Jurnal JOS-MRK","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal JOS-MRK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55404/jos-mrk.2021.02.03.221-226","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
在面积j1上。Kendalpayak - jr。新邦巴基玛琅县,洪水经常发生在雨季。这种洪水的发生是由于排水规划的能力不足,排水渠道中的废物容纳雨水径流的排放,排水规划不当,排水渠道中的废物,住户的废物量以及大量封闭的排水渠道,因为它们是为社区住宅而建造的。本文的目的是设计排水通道和渗井,计算施工成本,并制定该地区的作业调度计划。本研究采用Log Person III型,重新规划10年。所需的数据包括地形图、最近站点的降雨数据:2010年至2019年的克潘仁、苏昆和唐基尔萨里,以及2020年马郎摄政工作原则的价格。计算结果:设计降雨量为107,33 mm/d;设计洪流量2031 m3/s;入渗井尺寸为0.7米,深度为1.7米。排水通道尺寸按最小尺寸0.4 m × 0.4 m,最大尺寸1m × 1m规划,造价为Rp. 8,581,572,367.92,工期为18周
PERENCANAAN ULANG SALURAN DRAINASE KAWASAN JALAN KENDALPAYAK - JALAN SIMPANG PAKISAJI KABUPATEN MALANG
On area Jl. Kendalpayak – Jl.Simpang Pakisaji Malang Regency, inundation often occurs during the rainy season. The occurrence of this flooding is caused by the insufficient capacity of the drainage planning, waste in drainage channels to accommodate the discharge of rainwater runoff, improper drainage planning, waste in drainage channels, the amount of waste from households and the large number of closed drainage channels because they are made for community homes. The purpose of this thesis is to design drainage channels and infiltration wells, calculating construction costs as well as creating scheduling plans for job in the area. The method used in this study was the Log Person Type III with the re-planning for 10 years. The data needed are topographic maps, rainfall data from the closest stations: Kepanjen, Sukun, and Tangkilsari in 2010 until 2019, and the price of the Malang Regency work pricipil in 2020. The calculation results the design rainfall is 107, 33 mm/day; design flood discharge of 2,031m3/second; the infiltrations weels with dimensions of 0,7 meters with depth of 1,7 meters. The drainage channel dimensions are planned by the smallest size of 0,4 m x 0,4 m and the largest size is 1 m x 1 m with construction cost is Rp. 8,581,572,367.92 and the execution time is 18 weeks