{"title":"模拟电力系统恢复","authors":"O. Samuelsson, L. Lindgren","doi":"10.1109/UPEC.2008.4651473","DOIUrl":null,"url":null,"abstract":"Outage time after extensive blackouts depends very much on the power system restoration process. Power system restoration is a very challenging task to the operator since the situation is so far from normal conditions. This paper proposes a simulation-based tool that determines a feasible sequence of operator actions that restores power system operation. The effect of each candidate switching operation or setpoint change is evaluated mainly in terms of restored load and the predicted steady state voltage and frequency. Application to the CIGRE NORDIC32 test system shows that operation is fully restored from complete blackout after about 750 actions including network switching and gradual connection of system loads. The main applications of the methodology are off-line use for surveying new restoration strategies and on-line use for suggesting the next action to the operator.","PeriodicalId":287461,"journal":{"name":"2008 43rd International Universities Power Engineering Conference","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-12-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Simulated power system restoration\",\"authors\":\"O. Samuelsson, L. Lindgren\",\"doi\":\"10.1109/UPEC.2008.4651473\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Outage time after extensive blackouts depends very much on the power system restoration process. Power system restoration is a very challenging task to the operator since the situation is so far from normal conditions. This paper proposes a simulation-based tool that determines a feasible sequence of operator actions that restores power system operation. The effect of each candidate switching operation or setpoint change is evaluated mainly in terms of restored load and the predicted steady state voltage and frequency. Application to the CIGRE NORDIC32 test system shows that operation is fully restored from complete blackout after about 750 actions including network switching and gradual connection of system loads. The main applications of the methodology are off-line use for surveying new restoration strategies and on-line use for suggesting the next action to the operator.\",\"PeriodicalId\":287461,\"journal\":{\"name\":\"2008 43rd International Universities Power Engineering Conference\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-12-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 43rd International Universities Power Engineering Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/UPEC.2008.4651473\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 43rd International Universities Power Engineering Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UPEC.2008.4651473","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

大面积停电后的停电时间在很大程度上取决于电力系统的恢复过程。由于情况与正常情况相差甚远,电力系统的恢复对运营商来说是一项非常具有挑战性的任务。本文提出了一种基于仿真的工具来确定一个可行的操作员动作序列,以恢复电力系统的运行。每个候选开关操作或设定值变化的影响主要根据恢复的负载和预测的稳态电压和频率来评估。在CIGRE NORDIC32测试系统上的应用表明,经过750个动作,包括网络切换和系统负载的逐渐连接,完全停电后完全恢复运行。该方法的主要应用是离线用于调查新的修复策略,在线用于向运营商建议下一步行动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Simulated power system restoration
Outage time after extensive blackouts depends very much on the power system restoration process. Power system restoration is a very challenging task to the operator since the situation is so far from normal conditions. This paper proposes a simulation-based tool that determines a feasible sequence of operator actions that restores power system operation. The effect of each candidate switching operation or setpoint change is evaluated mainly in terms of restored load and the predicted steady state voltage and frequency. Application to the CIGRE NORDIC32 test system shows that operation is fully restored from complete blackout after about 750 actions including network switching and gradual connection of system loads. The main applications of the methodology are off-line use for surveying new restoration strategies and on-line use for suggesting the next action to the operator.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Study on model of power grid operation security cost in market environment Hybrid cascaded H- bridge multilevel inverter for fuel cell power conditioning systems Fault ride-through capability improvement of wind farms using doubly fed induction generator Protection, transient stability and fault ride-through issues in distribution networks with dispersed generation An architecture of spatial three dimension visualization information platform for urban power grid
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1