单价与一次性合同的价差比较:交易成本经济学方法

Linda Mikowati, Yohanna M. L. Gultom
{"title":"单价与一次性合同的价差比较:交易成本经济学方法","authors":"Linda Mikowati, Yohanna M. L. Gultom","doi":"10.36574/jpp.v7i1.443","DOIUrl":null,"url":null,"abstract":"This study compares two major types of contracts in public procurement, i.e. unit price and lump sum contracts, in terms of the gap between the winner's bid price and owner’s estimated price (OEP) in resulted price gap during the tender process, taking the case of government procurement in Indonesia. Using Indonesian e-tendering data of 2018-2021, this study employs an Ordinary Least Square regression to assess whether there is a difference in the price gap between the two types of contracts. This study finds that the average price gap in unit price contract is significantly higher than that of lump sum contracts. With the help of the transaction cost economics approach, this study discussed that the higher average price gap in unit price contracts is related to a lower information cost and lower risk of having a change order for the contract faced by the bidders. While in a lump sum contract, the winner's bid price is closer to OEP because bidders are faced with design risks that require higher information costs and contract adaptation during the execution phase. The study also found that the use of a unit price contract is significantly related to a longer tendering time due to a longer period in evaluating the bid.","PeriodicalId":209567,"journal":{"name":"Jurnal Perencanaan Pembangunan: The Indonesian Journal of Development Planning","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-04-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Price Gap Comparison in Unit Price and Lump Sum Contracts: A Transaction Cost Economic Approach\",\"authors\":\"Linda Mikowati, Yohanna M. L. Gultom\",\"doi\":\"10.36574/jpp.v7i1.443\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study compares two major types of contracts in public procurement, i.e. unit price and lump sum contracts, in terms of the gap between the winner's bid price and owner’s estimated price (OEP) in resulted price gap during the tender process, taking the case of government procurement in Indonesia. Using Indonesian e-tendering data of 2018-2021, this study employs an Ordinary Least Square regression to assess whether there is a difference in the price gap between the two types of contracts. This study finds that the average price gap in unit price contract is significantly higher than that of lump sum contracts. With the help of the transaction cost economics approach, this study discussed that the higher average price gap in unit price contracts is related to a lower information cost and lower risk of having a change order for the contract faced by the bidders. While in a lump sum contract, the winner's bid price is closer to OEP because bidders are faced with design risks that require higher information costs and contract adaptation during the execution phase. The study also found that the use of a unit price contract is significantly related to a longer tendering time due to a longer period in evaluating the bid.\",\"PeriodicalId\":209567,\"journal\":{\"name\":\"Jurnal Perencanaan Pembangunan: The Indonesian Journal of Development Planning\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-04-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Perencanaan Pembangunan: The Indonesian Journal of Development Planning\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36574/jpp.v7i1.443\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Perencanaan Pembangunan: The Indonesian Journal of Development Planning","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36574/jpp.v7i1.443","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究以印尼政府采购为例,比较了公共采购中的两种主要合同类型,即单价合同和一次性付款合同,在招标过程中导致价格差距的中标价格与业主估计价格(OEP)之间的差距。本研究使用印度尼西亚2018-2021年的电子招标数据,采用普通最小二乘回归来评估两种合同之间的价格差距是否存在差异。本研究发现,单价合同的平均价格差距显著高于一次性合同。本文借助交易成本经济学的方法,讨论了单价合同中平均价格差距越大,投标方面临的信息成本越低,合同变更的风险越低。而在一次性合同中,中标者的投标价格更接近OEP,因为投标人在执行阶段面临设计风险,需要更高的信息成本和合同适应。研究还发现,由于评估投标的时间较长,使用单价合同与较长的投标时间显著相关。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Price Gap Comparison in Unit Price and Lump Sum Contracts: A Transaction Cost Economic Approach
This study compares two major types of contracts in public procurement, i.e. unit price and lump sum contracts, in terms of the gap between the winner's bid price and owner’s estimated price (OEP) in resulted price gap during the tender process, taking the case of government procurement in Indonesia. Using Indonesian e-tendering data of 2018-2021, this study employs an Ordinary Least Square regression to assess whether there is a difference in the price gap between the two types of contracts. This study finds that the average price gap in unit price contract is significantly higher than that of lump sum contracts. With the help of the transaction cost economics approach, this study discussed that the higher average price gap in unit price contracts is related to a lower information cost and lower risk of having a change order for the contract faced by the bidders. While in a lump sum contract, the winner's bid price is closer to OEP because bidders are faced with design risks that require higher information costs and contract adaptation during the execution phase. The study also found that the use of a unit price contract is significantly related to a longer tendering time due to a longer period in evaluating the bid.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Hibernation of the Village Law in Large-Scale Palm Oil Plantations: A Case Study of Oil Palm Expansion in Sintang District, West Kalimantan Government Health Expenditure and Stunting Prevalence Reduction in Indonesia The Role of Gender Equality on Poverty Alleviation: Case of Indonesia The Effect of Local Government’s Elderly Social Assistance on Health Spending of Poor Elderly in Indonesia Critical Success Factor (CSF) of Implementing PPP Road Sector in Indonesia
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1