智能电网电力IT试验台系统

N. Yu, Ji-Tae Kim, Yong-Seok Seon, Sangmin Yeo, Joon-Hong Jung
{"title":"智能电网电力IT试验台系统","authors":"N. Yu, Ji-Tae Kim, Yong-Seok Seon, Sangmin Yeo, Joon-Hong Jung","doi":"10.1109/TD-ASIA.2009.5356843","DOIUrl":null,"url":null,"abstract":"When merging new power IT(PIT) systems, it is necessary to evaluate operating condition in order to verify the efficiency of these systems. To do so, it is required to develop some test tool and test-bed system. In this paper, we propose a design methodology of this test tool. The test tool is concerned about PIT research results such as intelligent transmission system, power telemetrics, K-EMS(Korea-Energy Management System), digital substation system, intelligent distribution system, and value added service of power system.","PeriodicalId":131589,"journal":{"name":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Power IT test-bed system for smart grid\",\"authors\":\"N. Yu, Ji-Tae Kim, Yong-Seok Seon, Sangmin Yeo, Joon-Hong Jung\",\"doi\":\"10.1109/TD-ASIA.2009.5356843\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"When merging new power IT(PIT) systems, it is necessary to evaluate operating condition in order to verify the efficiency of these systems. To do so, it is required to develop some test tool and test-bed system. In this paper, we propose a design methodology of this test tool. The test tool is concerned about PIT research results such as intelligent transmission system, power telemetrics, K-EMS(Korea-Energy Management System), digital substation system, intelligent distribution system, and value added service of power system.\",\"PeriodicalId\":131589,\"journal\":{\"name\":\"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TD-ASIA.2009.5356843\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TD-ASIA.2009.5356843","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

在合并新的电力IT(PIT)系统时,为了验证系统的效率,需要对系统的运行状态进行评估。为此,需要开发一些测试工具和测试平台系统。在本文中,我们提出了该测试工具的设计方法。测试工具关注智能输电系统、电力遥测、K-EMS(韩国能源管理系统)、数字化变电站系统、智能配电系统、电力系统增值服务等PIT研究成果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Power IT test-bed system for smart grid
When merging new power IT(PIT) systems, it is necessary to evaluate operating condition in order to verify the efficiency of these systems. To do so, it is required to develop some test tool and test-bed system. In this paper, we propose a design methodology of this test tool. The test tool is concerned about PIT research results such as intelligent transmission system, power telemetrics, K-EMS(Korea-Energy Management System), digital substation system, intelligent distribution system, and value added service of power system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Operational analysis of DC micro-grid using detailed model of distributed generation Real time digital simulator based test system for microgrid management system Case study of customer baseline(CBL) load determination in Korea based on statistical method Assessment of Conditional Value at Risk (CVaR) in transmission investment using Cross Entropy method Governor-response power flow (GRPF) based long-term voltage stability simulation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1