国际建设项目分包商选择模型的实证研究

Changjun Lee, Hochan Seok, Sangjun Lee, Woosik Jang, S. Han
{"title":"国际建设项目分包商选择模型的实证研究","authors":"Changjun Lee, Hochan Seok, Sangjun Lee, Woosik Jang, S. Han","doi":"10.6106/KJCEM.2016.17.2.118","DOIUrl":null,"url":null,"abstract":"Abstract : International construction market have quantitatively increased and have reached up to 700 Bil. US$ through active effort of construction firms and government. In spite of this increase, substantiality issue has been constantly disputed due to qualitative problems such as lack of capability and technical shortage. To overcome these problems, many methods in performing quantitative growth and qualitative substantiality of overseas construction are being researched which showed that selection of subcontractors in general contractor is regarded as a very important success factor. However, it is difficult to make a reasonable decision for selecting the subcontractors due to the lack of evaluation standards and reliability. This study proposes an improved evaluation system through adjustment of the evaluation indicators using correlations analysis and multiple regression analysis with pre-qualification and performance evaluation of 121 firms in 6 countries. Keywords : Subcontractor, Pre-qualification, Performance Evaluation, Correlation Analysis, Multiple Regression Analysis","PeriodicalId":220018,"journal":{"name":"Korean Journal of Construction Engineering and Management","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Empirical Research for Subcontractor Selection Model in the International Construction Project\",\"authors\":\"Changjun Lee, Hochan Seok, Sangjun Lee, Woosik Jang, S. Han\",\"doi\":\"10.6106/KJCEM.2016.17.2.118\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract : International construction market have quantitatively increased and have reached up to 700 Bil. US$ through active effort of construction firms and government. In spite of this increase, substantiality issue has been constantly disputed due to qualitative problems such as lack of capability and technical shortage. To overcome these problems, many methods in performing quantitative growth and qualitative substantiality of overseas construction are being researched which showed that selection of subcontractors in general contractor is regarded as a very important success factor. However, it is difficult to make a reasonable decision for selecting the subcontractors due to the lack of evaluation standards and reliability. This study proposes an improved evaluation system through adjustment of the evaluation indicators using correlations analysis and multiple regression analysis with pre-qualification and performance evaluation of 121 firms in 6 countries. Keywords : Subcontractor, Pre-qualification, Performance Evaluation, Correlation Analysis, Multiple Regression Analysis\",\"PeriodicalId\":220018,\"journal\":{\"name\":\"Korean Journal of Construction Engineering and Management\",\"volume\":\"8 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-03-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Korean Journal of Construction Engineering and Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.6106/KJCEM.2016.17.2.118\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Korean Journal of Construction Engineering and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.6106/KJCEM.2016.17.2.118","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

[摘要]国际建筑市场规模不断扩大,已达7000亿美元。通过建筑公司和政府的积极努力。尽管数量有所增加,但由于能力不足、技术不足等质量问题,实体性问题一直存在争议。为了克服这些问题,人们研究了许多实现海外工程数量增长和质量充实的方法,表明总承包商中分包商的选择是一个非常重要的成功因素。然而,由于缺乏评价标准和可靠性,难以对分包商的选择做出合理的决策。本研究通过对6个国家121家企业的资格预审和绩效评价进行相关性分析和多元回归分析,对评价指标进行调整,提出了完善的评价体系。关键词:分包商,资格预审,绩效评价,相关分析,多元回归分析
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A Empirical Research for Subcontractor Selection Model in the International Construction Project
Abstract : International construction market have quantitatively increased and have reached up to 700 Bil. US$ through active effort of construction firms and government. In spite of this increase, substantiality issue has been constantly disputed due to qualitative problems such as lack of capability and technical shortage. To overcome these problems, many methods in performing quantitative growth and qualitative substantiality of overseas construction are being researched which showed that selection of subcontractors in general contractor is regarded as a very important success factor. However, it is difficult to make a reasonable decision for selecting the subcontractors due to the lack of evaluation standards and reliability. This study proposes an improved evaluation system through adjustment of the evaluation indicators using correlations analysis and multiple regression analysis with pre-qualification and performance evaluation of 121 firms in 6 countries. Keywords : Subcontractor, Pre-qualification, Performance Evaluation, Correlation Analysis, Multiple Regression Analysis
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
BIM 기술 융·복합 수준 분석을 위한 특허 정보 활용 방안 Analysis of Leasing Decision Determinants by the Store Size and Lend-Lease Perspectives for Mix-Used Shopping Mall Development Seamless Superimposition Technique of Virtual Objects for AR System of Excavator Based on Image Processing Review of Real Options Analysis for Renewable Energy Projects Improvement of the Calculation Standard for Prolongation cost of Long-term Continuing Contracts Construction Project
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1