MUSYAFFA' Alqowi, Dwi Ratnaningsih, Winda Harsanti
{"title":"PERENCANAAN ULANG GEOMETRIK JALAN UNTUK QUARRY BENDUNGAN SEMANTOK KABUPATEN NGANJUK (STA 00+000 s/d STA 05+000)","authors":"MUSYAFFA' Alqowi, Dwi Ratnaningsih, Winda Harsanti","doi":"10.55404/jos-mrk.2021.02.03.138-142","DOIUrl":null,"url":null,"abstract":"In the Semantok Dam construction project in Nganjuk Regency, local road access to the quarry is required. The road access is needed to support the mobilization of material originating from the quarry. The road will also become a public road and at the same time become a tourist access at the Semantok Dam. And the plan will use rigid pavement as pavement. The data needed for planning is the volume of traffic planning hours, CBR of land, topographic maps, and the price of the main unit of activity (HSPK) in 2019 in Nganjuk Regency. This planning refers to the InterCity Road Geometric Planning Procedure No. 038 / T / BM / 1997, Method of Bina Marga for Pavement Planningfor Cement Concrete Roads SNI Pd T-14-2003, Analysis of Unit Prices by way of Bina Marga No. 28 / PRT / M / 2016. This planning resulted in a road with a length of 5 km, a width of 3.5 m per lane, an undivided 4-lane 2-way road type (4/2 UD), and 2 m wide shoulders; 4 S-C-S bends (Spiral Circle Spiral) and 3 S-S bends (Spiral Spiral) and 3 convex and 4 concave vertical bends; The pavement thickness is 210 mm and the thickness of the road foundation is 150 mm; with a budgetof Rp.34,214,243,074","PeriodicalId":337938,"journal":{"name":"Jurnal JOS-MRK","volume":"73 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal JOS-MRK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55404/jos-mrk.2021.02.03.138-142","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在nangjuk摄政的Semantok大坝建设项目中,需要当地的道路通往采石场。需要道路通道来支持采石场原料的调动。这条道路也将成为一条公共道路,同时成为Semantok大坝的旅游通道。该计划将使用刚性路面作为路面。规划所需的数据是nangjuk摄政王2019年的交通规划小时数、土地CBR、地形图和主要活动单位(HSPK)的价格。本规划参照《城际道路几何规划规程》第038 / T / BM / 1997号、《水泥混凝土道路路面规划比纳玛加方法》SNI Pd T-14-2003号、《比纳玛加28 / PRT / M / 2016号单价分析》。这条道路长5公里,每条车道宽3.5米,是一条不分割的4车道双向道路类型(4/2 UD),道路肩宽2米;4个S-C-S弯(螺旋圆螺旋),3个S-S弯(螺旋螺旋),3个凸弯,4个凹弯;路面厚度210 mm,道路基础厚度150 mm;预算为34,214,243,074卢比
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
PERENCANAAN ULANG GEOMETRIK JALAN UNTUK QUARRY BENDUNGAN SEMANTOK KABUPATEN NGANJUK (STA 00+000 s/d STA 05+000)
In the Semantok Dam construction project in Nganjuk Regency, local road access to the quarry is required. The road access is needed to support the mobilization of material originating from the quarry. The road will also become a public road and at the same time become a tourist access at the Semantok Dam. And the plan will use rigid pavement as pavement. The data needed for planning is the volume of traffic planning hours, CBR of land, topographic maps, and the price of the main unit of activity (HSPK) in 2019 in Nganjuk Regency. This planning refers to the InterCity Road Geometric Planning Procedure No. 038 / T / BM / 1997, Method of Bina Marga for Pavement Planningfor Cement Concrete Roads SNI Pd T-14-2003, Analysis of Unit Prices by way of Bina Marga No. 28 / PRT / M / 2016. This planning resulted in a road with a length of 5 km, a width of 3.5 m per lane, an undivided 4-lane 2-way road type (4/2 UD), and 2 m wide shoulders; 4 S-C-S bends (Spiral Circle Spiral) and 3 S-S bends (Spiral Spiral) and 3 convex and 4 concave vertical bends; The pavement thickness is 210 mm and the thickness of the road foundation is 150 mm; with a budgetof Rp.34,214,243,074
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
ANALISIS STABILITAS TUBUH BENDUNGAN PADA BENDUNGAN SEMANTOK KABUPATEN NGANJUK PROVINSI JAWA TIMUR ANALISA PERPANJANGAN LANDASAN PACU PADA BANDAR UDARA ABDULRACHMAN SALEH MALANG (STA 2+250 – STA 3+000) EVALUASI DAN PERENCANAAN ULANG SISTEM JARINGAN DRAINASE KECAMATAN KARTOHARJO KOTA MADIUN ANALISA KERUSAKAN JALAN MENGGUNAKAN METODE BINA MARGA PADA JALAN RAYA JERU – JALAN RAYA TUMPANG KABUPATEN MALANG PERENCANAAN ULANG STRUKTUR ATAS DAN RAB GEDUNG KULIAH AKN PUTRA SANG FAJAR
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1