关键路径法在项目管理信息系统中的实施及What - If分析

Zulfiandri, Farah Dhia Yasmin, Rinda Hesti Kusumaningtyas
{"title":"关键路径法在项目管理信息系统中的实施及What - If分析","authors":"Zulfiandri, Farah Dhia Yasmin, Rinda Hesti Kusumaningtyas","doi":"10.1109/CITSM56380.2022.9935912","DOIUrl":null,"url":null,"abstract":"Project management is the process of planning, im-plementing, monitoring and closing projects so that the project runs according to the target. One company that requires project management is PT. Triprima Karya which offers construction project consulting services. In the company there are problems, namely there are still delays in several projects which result in de-lays in project payments so that it can harm the company. The purpose of this research is to implement the critical path method and what if analysis to anticipate project delays at PT Triprima Karya. The methods used for delay analysis are Critical Path Method and What If Analysis. The results of the research are based on the critical path method, the critical path on the project is the Preliminary work (A), Preparatory work (B), Construction work (C), Mechanical and plumbing work (E), Electrical work (F), Power connection new electricity (H). And if activity A is delayed for 7 days, based on the results of what if analysis calculations, the activities that can be accelerated are Preparatory work (B) with an additional number of 5 workers and 8 hours, Construction work (C) with an additional 1 worker and 0, 9 hours, Mechanical and plumbing work (E) with an additional number of 1 worker and 1 hour, Electrical work (F) with an additional 1 worker and 1.1 hours New electrical power connection (H) with an additional number of 3 workers and 4 hours.","PeriodicalId":342813,"journal":{"name":"2022 10th International Conference on Cyber and IT Service Management (CITSM)","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Implementation of Critical Path Method and What If Analysis in Project Management Information System\",\"authors\":\"Zulfiandri, Farah Dhia Yasmin, Rinda Hesti Kusumaningtyas\",\"doi\":\"10.1109/CITSM56380.2022.9935912\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Project management is the process of planning, im-plementing, monitoring and closing projects so that the project runs according to the target. One company that requires project management is PT. Triprima Karya which offers construction project consulting services. In the company there are problems, namely there are still delays in several projects which result in de-lays in project payments so that it can harm the company. The purpose of this research is to implement the critical path method and what if analysis to anticipate project delays at PT Triprima Karya. The methods used for delay analysis are Critical Path Method and What If Analysis. The results of the research are based on the critical path method, the critical path on the project is the Preliminary work (A), Preparatory work (B), Construction work (C), Mechanical and plumbing work (E), Electrical work (F), Power connection new electricity (H). And if activity A is delayed for 7 days, based on the results of what if analysis calculations, the activities that can be accelerated are Preparatory work (B) with an additional number of 5 workers and 8 hours, Construction work (C) with an additional 1 worker and 0, 9 hours, Mechanical and plumbing work (E) with an additional number of 1 worker and 1 hour, Electrical work (F) with an additional 1 worker and 1.1 hours New electrical power connection (H) with an additional number of 3 workers and 4 hours.\",\"PeriodicalId\":342813,\"journal\":{\"name\":\"2022 10th International Conference on Cyber and IT Service Management (CITSM)\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 10th International Conference on Cyber and IT Service Management (CITSM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CITSM56380.2022.9935912\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 10th International Conference on Cyber and IT Service Management (CITSM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CITSM56380.2022.9935912","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

项目管理是计划、实施、监视和结束项目的过程,使项目按照目标运行。一个需要项目管理的公司是PT. Triprima Karya,它提供建筑项目咨询服务。公司存在一些问题,即有几个项目仍然存在延迟,导致项目付款延迟,从而对公司造成损害。本研究的目的是在Triprima Karya PT实施关键路径方法和如果分析来预测项目延迟。用于延迟分析的方法有关键路径法和假设分析法。研究结果基于关键路径法,项目的关键路径为前期工作(A),前期准备工作(B),施工工作(C),机械和管道工作(E),电气工作(F),电源连接新电(H)。如果活动A延迟7天,根据分析计算的结果,可以加速的活动是准备工作(B),增加5名工人和8小时。建筑工程(C)增聘1名工人及0.9小时;机械及水管工程(E)增聘1名工人及1小时;电力工程(F)增聘1名工人及1.1小时;新接电工程(H)增聘3名工人及4小时。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Implementation of Critical Path Method and What If Analysis in Project Management Information System
Project management is the process of planning, im-plementing, monitoring and closing projects so that the project runs according to the target. One company that requires project management is PT. Triprima Karya which offers construction project consulting services. In the company there are problems, namely there are still delays in several projects which result in de-lays in project payments so that it can harm the company. The purpose of this research is to implement the critical path method and what if analysis to anticipate project delays at PT Triprima Karya. The methods used for delay analysis are Critical Path Method and What If Analysis. The results of the research are based on the critical path method, the critical path on the project is the Preliminary work (A), Preparatory work (B), Construction work (C), Mechanical and plumbing work (E), Electrical work (F), Power connection new electricity (H). And if activity A is delayed for 7 days, based on the results of what if analysis calculations, the activities that can be accelerated are Preparatory work (B) with an additional number of 5 workers and 8 hours, Construction work (C) with an additional 1 worker and 0, 9 hours, Mechanical and plumbing work (E) with an additional number of 1 worker and 1 hour, Electrical work (F) with an additional 1 worker and 1.1 hours New electrical power connection (H) with an additional number of 3 workers and 4 hours.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Fault Detection in Wireless Sensor Networks Data Using Random Under Sampling and Extra-Tree Algorithm Automated House Budget Plan Application Analysis of E-Government Service Quality using E-GovQual and Importance Performance Analysis (IPA) Analysis of Public Sentiment Using The K-Nearest Neighbor (k-NN) Algorithm and Lexicon Based on Indonesian Television Shows on Social Media Twitter Heuristic and Webuse Method to Evaluate UI/UX of Faculty Website
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1