马来西亚能源委员会的CdTe并网光伏系统:性能和可持续性问题

A. Junid, M. Hamdan, Shazrizal Bakar
{"title":"马来西亚能源委员会的CdTe并网光伏系统:性能和可持续性问题","authors":"A. Junid, M. Hamdan, Shazrizal Bakar","doi":"10.1109/STUDENT.2011.6089347","DOIUrl":null,"url":null,"abstract":"Commissioned in November 2009, Malaysia's Energy Commission headquarters utilizes a 71.4kWp rated grid-connected Cadmium-Telluride (CdTe) thin-film photovoltaic system which meets approximately 10% of the building's average electrical power demand. As of June 2011, the photovoltaic panel performance degradation rate is about 3.4% over 1.67 years, i.e. 2% per annum. The system's economic sustainability may be represented by an estimated payback period of 21 years at an Internal Rate of Return (IRR) of 2–4%. Once a higher feed-in tariff supported by the Renewable Energy Act 2010 takes effect, IRR will increase and payback time will fall. Environmental sustainability is supported by the panel manufacturer's written policy that it will collect and recycle panels free of charge.","PeriodicalId":247351,"journal":{"name":"2011 IEEE Conference on Sustainable Utilization and Development in Engineering and Technology (STUDENT)","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"CdTe grid-connected photovoltaic system at energy commission Malaysia: Performance and sustainability issues\",\"authors\":\"A. Junid, M. Hamdan, Shazrizal Bakar\",\"doi\":\"10.1109/STUDENT.2011.6089347\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Commissioned in November 2009, Malaysia's Energy Commission headquarters utilizes a 71.4kWp rated grid-connected Cadmium-Telluride (CdTe) thin-film photovoltaic system which meets approximately 10% of the building's average electrical power demand. As of June 2011, the photovoltaic panel performance degradation rate is about 3.4% over 1.67 years, i.e. 2% per annum. The system's economic sustainability may be represented by an estimated payback period of 21 years at an Internal Rate of Return (IRR) of 2–4%. Once a higher feed-in tariff supported by the Renewable Energy Act 2010 takes effect, IRR will increase and payback time will fall. Environmental sustainability is supported by the panel manufacturer's written policy that it will collect and recycle panels free of charge.\",\"PeriodicalId\":247351,\"journal\":{\"name\":\"2011 IEEE Conference on Sustainable Utilization and Development in Engineering and Technology (STUDENT)\",\"volume\":\"25 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 IEEE Conference on Sustainable Utilization and Development in Engineering and Technology (STUDENT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/STUDENT.2011.6089347\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 IEEE Conference on Sustainable Utilization and Development in Engineering and Technology (STUDENT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/STUDENT.2011.6089347","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

马来西亚能源委员会总部于2009年11月投入使用,采用71.4kWp额定并网碲化镉(CdTe)薄膜光伏系统,可满足建筑物平均电力需求的约10%。截至2011年6月,光伏板的性能退化率在1.67年内约为3.4%,即每年2%。该系统的经济可持续性可以用预计21年的投资回收期来表示,内部收益率(IRR)为2-4%。一旦《2010年可再生能源法案》支持的更高的上网电价生效,内部收益率将增加,投资回收期将缩短。电池板制造商的书面政策支持环境可持续性,该政策将免费收集和回收电池板。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
CdTe grid-connected photovoltaic system at energy commission Malaysia: Performance and sustainability issues
Commissioned in November 2009, Malaysia's Energy Commission headquarters utilizes a 71.4kWp rated grid-connected Cadmium-Telluride (CdTe) thin-film photovoltaic system which meets approximately 10% of the building's average electrical power demand. As of June 2011, the photovoltaic panel performance degradation rate is about 3.4% over 1.67 years, i.e. 2% per annum. The system's economic sustainability may be represented by an estimated payback period of 21 years at an Internal Rate of Return (IRR) of 2–4%. Once a higher feed-in tariff supported by the Renewable Energy Act 2010 takes effect, IRR will increase and payback time will fall. Environmental sustainability is supported by the panel manufacturer's written policy that it will collect and recycle panels free of charge.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Cloud enabled spam filtering services: Challenges and opportunities An investigation for closed loop control of single phase induction motors using industrial components Mental tasks classifications using S-transform for BCI applications Development of a multi-touch table for natural user interface A semi-automated floor tiling robotic system
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1