{"title":"EVALUASI DAN PERENCANAAN ULANG JARINGAN DRAINASE UNTUK PENANGGULANGAN BANJIR DI DESA KADEMANGAN KECAMATAN MOJOAGUNG KABUPATEN JOMBANG","authors":"Noroyono Wibowo, S. Sutikno, Agus Suhardono","doi":"10.55404/jos-mrk.2021.02.03.180-187","DOIUrl":null,"url":null,"abstract":"Along with the development of community dynamics in the District of Mojoagung, especially in the area of Kademangan Village, it can cause flooding due to changes in land cover from paddy fields to residential areas, facilities and other infrastructure such as roads. This thesis aims to evaluate and plan drainage networks, existing planning drawings, Budget Plans, and project implementation schedules using the S curve method. In the implementation, the analysis of hydrology and hydraulics is carried out. Hydrological analysis is carried out with the aim of calculating the plan debit using a rational method and hydraulic analysis is carried out to calculate the capacity of the existing drainage channels. So that it can be known the location of the point of flooding that occurred and the new channel dimension planning. The results of the study with a 10-year return based on dispersion measurements obtained a suitable distribution is the Pearson Log Log Distribution III with planned debit values in each channel and most of the existing channels are not able to accommodate flood debit. Then re-planning is needed for a channel that cannot accommodate flood debit and the results of planning are drawing plans, the value of the Cost Budget Plan isRp.2,794,165,433.04, -, and planned project implementation schedule which is 12 weeks long.","PeriodicalId":337938,"journal":{"name":"Jurnal JOS-MRK","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal JOS-MRK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55404/jos-mrk.2021.02.03.180-187","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

随着Mojoagung地区社区动态的发展,特别是在Kademangan村地区,由于土地覆盖从稻田到居民区、设施和其他基础设施(如道路)的变化,它可能导致洪水。本文旨在利用S曲线法对排水网络、现有规划图纸、预算计划和项目实施进度进行评估和规划。在实施过程中,进行了水文水力学分析。进行水文分析,采用合理的方法计算计划费用;进行水力分析,计算现有排水渠道的容量。这样就可以知道发生洪水的点的位置和新的通道尺寸规划。基于离散度测量的10年回报研究结果得出了一个合适的分布是Pearson Log Log分布III,每个通道都有计划的借方值,大多数现有通道无法容纳洪水借方。然后需要重新规划一个不能容纳洪水借方的通道,规划的结果是绘制计划,成本预算计划的价值为rp .2,794,165,433.04, -和计划的项目实施时间表,为期12周。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
EVALUASI DAN PERENCANAAN ULANG JARINGAN DRAINASE UNTUK PENANGGULANGAN BANJIR DI DESA KADEMANGAN KECAMATAN MOJOAGUNG KABUPATEN JOMBANG
Along with the development of community dynamics in the District of Mojoagung, especially in the area of Kademangan Village, it can cause flooding due to changes in land cover from paddy fields to residential areas, facilities and other infrastructure such as roads. This thesis aims to evaluate and plan drainage networks, existing planning drawings, Budget Plans, and project implementation schedules using the S curve method. In the implementation, the analysis of hydrology and hydraulics is carried out. Hydrological analysis is carried out with the aim of calculating the plan debit using a rational method and hydraulic analysis is carried out to calculate the capacity of the existing drainage channels. So that it can be known the location of the point of flooding that occurred and the new channel dimension planning. The results of the study with a 10-year return based on dispersion measurements obtained a suitable distribution is the Pearson Log Log Distribution III with planned debit values in each channel and most of the existing channels are not able to accommodate flood debit. Then re-planning is needed for a channel that cannot accommodate flood debit and the results of planning are drawing plans, the value of the Cost Budget Plan isRp.2,794,165,433.04, -, and planned project implementation schedule which is 12 weeks long.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
ANALISIS STABILITAS TUBUH BENDUNGAN PADA BENDUNGAN SEMANTOK KABUPATEN NGANJUK PROVINSI JAWA TIMUR ANALISA PERPANJANGAN LANDASAN PACU PADA BANDAR UDARA ABDULRACHMAN SALEH MALANG (STA 2+250 – STA 3+000) EVALUASI DAN PERENCANAAN ULANG SISTEM JARINGAN DRAINASE KECAMATAN KARTOHARJO KOTA MADIUN ANALISA KERUSAKAN JALAN MENGGUNAKAN METODE BINA MARGA PADA JALAN RAYA JERU – JALAN RAYA TUMPANG KABUPATEN MALANG PERENCANAAN ULANG STRUKTUR ATAS DAN RAB GEDUNG KULIAH AKN PUTRA SANG FAJAR
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1