{"title":"用折线图给出了平面优化算法","authors":"N. Majdandžić, G. Matičević, R. Lujic","doi":"10.1109/ITI.2001.938041","DOIUrl":null,"url":null,"abstract":"Producers have confronted customers' requirements on market and make to order production. Key characteristics of concurrent production strategy are flexibility, and short production cycle and the basic goals that have to be managed are dates, costs and quality. The production cycle has to be decreased if producers want to satisfy due date according to contract. An optimisation planning and monitoring algorithm for single production that has been implemented in a management information system (MIS) is presented.","PeriodicalId":375405,"journal":{"name":"Proceedings of the 23rd International Conference on Information Technology Interfaces, 2001. ITI 2001.","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-06-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Plan optimisation algorithm given with line chart\",\"authors\":\"N. Majdandžić, G. Matičević, R. Lujic\",\"doi\":\"10.1109/ITI.2001.938041\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Producers have confronted customers' requirements on market and make to order production. Key characteristics of concurrent production strategy are flexibility, and short production cycle and the basic goals that have to be managed are dates, costs and quality. The production cycle has to be decreased if producers want to satisfy due date according to contract. An optimisation planning and monitoring algorithm for single production that has been implemented in a management information system (MIS) is presented.\",\"PeriodicalId\":375405,\"journal\":{\"name\":\"Proceedings of the 23rd International Conference on Information Technology Interfaces, 2001. ITI 2001.\",\"volume\":\"46 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2001-06-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 23rd International Conference on Information Technology Interfaces, 2001. ITI 2001.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ITI.2001.938041\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 23rd International Conference on Information Technology Interfaces, 2001. ITI 2001.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ITI.2001.938041","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Producers have confronted customers' requirements on market and make to order production. Key characteristics of concurrent production strategy are flexibility, and short production cycle and the basic goals that have to be managed are dates, costs and quality. The production cycle has to be decreased if producers want to satisfy due date according to contract. An optimisation planning and monitoring algorithm for single production that has been implemented in a management information system (MIS) is presented.