{"title":"实务概览","authors":"H. Rapp","doi":"10.4324/9781315110530-36","DOIUrl":null,"url":null,"abstract":"There are always more project proposals than there are available resources. The priority system needs to select projects that best contribute to the organization’s objectives, within the constraints of the resources available. If all projects and their respective resources are computer scheduled, the feasibility and impact of adding a new project to those in process can be quickly assessed. With this information the project priority team will add a new project only if resources are available to be formally committed to that specific project. This chapter examines methods of scheduling resources so the team can make realistic judgments of resource availability and project durations. The project manager uses the same schedule for implementing the project. If changes occur during project implementation, the computer schedule is easily updated and the effects easily assessed.","PeriodicalId":230462,"journal":{"name":"The International Handbook of Art Therapy in Palliative and Bereavement Care","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Snapshot of Practice\",\"authors\":\"H. Rapp\",\"doi\":\"10.4324/9781315110530-36\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"There are always more project proposals than there are available resources. The priority system needs to select projects that best contribute to the organization’s objectives, within the constraints of the resources available. If all projects and their respective resources are computer scheduled, the feasibility and impact of adding a new project to those in process can be quickly assessed. With this information the project priority team will add a new project only if resources are available to be formally committed to that specific project. This chapter examines methods of scheduling resources so the team can make realistic judgments of resource availability and project durations. The project manager uses the same schedule for implementing the project. If changes occur during project implementation, the computer schedule is easily updated and the effects easily assessed.\",\"PeriodicalId\":230462,\"journal\":{\"name\":\"The International Handbook of Art Therapy in Palliative and Bereavement Care\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-05-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The International Handbook of Art Therapy in Palliative and Bereavement Care\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4324/9781315110530-36\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The International Handbook of Art Therapy in Palliative and Bereavement Care","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4324/9781315110530-36","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

项目提案总是比可用资源多。优先级系统需要在现有资源的限制下选择最有助于组织目标的项目。如果所有项目及其各自的资源都是计算机调度的,则可以快速评估向正在进行的项目中添加新项目的可行性和影响。有了这些信息,项目优先级团队只有在资源可用的情况下才会添加一个新项目,以便正式地将其投入到特定的项目中。本章考察了调度资源的方法,以便团队可以对资源可用性和项目持续时间做出现实的判断。项目经理使用相同的进度表来实施项目。如果在项目实施过程中发生变化,计算机进度表很容易更新,影响也很容易评估。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Snapshot of Practice
There are always more project proposals than there are available resources. The priority system needs to select projects that best contribute to the organization’s objectives, within the constraints of the resources available. If all projects and their respective resources are computer scheduled, the feasibility and impact of adding a new project to those in process can be quickly assessed. With this information the project priority team will add a new project only if resources are available to be formally committed to that specific project. This chapter examines methods of scheduling resources so the team can make realistic judgments of resource availability and project durations. The project manager uses the same schedule for implementing the project. If changes occur during project implementation, the computer schedule is easily updated and the effects easily assessed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Communitas and Soul-Healing Utilizing Tablet Computers in Art Therapy for Young People With Chronic and Life-Limiting Illnesses Art Therapy and Juvenile NCL Connecting and Belonging Narratives East West—Art Therapy in a Hospice in Northern India
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1