以某油润滑液压系统制造企业为例,提出了一种生产调度优化方法

A. Katasonov, Toni Lastusilta, Timo Korvola, Leila Saari, Dan Bendas, Wael M. Mohammed, A. N. Lee
{"title":"以某油润滑液压系统制造企业为例,提出了一种生产调度优化方法","authors":"A. Katasonov, Toni Lastusilta, Timo Korvola, Leila Saari, Dan Bendas, Wael M. Mohammed, A. N. Lee","doi":"10.1109/ICE.2017.8280007","DOIUrl":null,"url":null,"abstract":"Cloud-enabled tools developed in the Cloud Collaborative Manufacturing Networks (C2NET) project address the needs of small and medium enterprises with respect to information exchange and visibility across the collaboration partners in the supply network, coupled with automated and collaborative production planning and supply management. This paper analyses a case of an oil lubrication and hydraulic systems manufacturer and describes a pilot application of C2NET where the production schedule is optimized according to the priorities of the pilot company. In this case the goal is a highly adaptive just-in-time manufacturing schedule with guaranteed on time delivery.","PeriodicalId":421648,"journal":{"name":"2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC)","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"An approach to production scheduling optimization a case of an oil lubrication and hydraulic systems manufacturer\",\"authors\":\"A. Katasonov, Toni Lastusilta, Timo Korvola, Leila Saari, Dan Bendas, Wael M. Mohammed, A. N. Lee\",\"doi\":\"10.1109/ICE.2017.8280007\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Cloud-enabled tools developed in the Cloud Collaborative Manufacturing Networks (C2NET) project address the needs of small and medium enterprises with respect to information exchange and visibility across the collaboration partners in the supply network, coupled with automated and collaborative production planning and supply management. This paper analyses a case of an oil lubrication and hydraulic systems manufacturer and describes a pilot application of C2NET where the production schedule is optimized according to the priorities of the pilot company. In this case the goal is a highly adaptive just-in-time manufacturing schedule with guaranteed on time delivery.\",\"PeriodicalId\":421648,\"journal\":{\"name\":\"2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC)\",\"volume\":\"21 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-06-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICE.2017.8280007\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICE.2017.8280007","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

在云协同制造网络(C2NET)项目中开发的云支持工具解决了中小型企业在供应网络中跨协作伙伴的信息交换和可见性方面的需求,以及自动化和协作生产计划和供应管理。本文以某石油润滑液压系统制造企业为例,介绍了C2NET的试点应用,根据试点企业的生产优先级对生产计划进行优化。在这种情况下,目标是一个高度自适应的准时生产计划,保证准时交货。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
An approach to production scheduling optimization a case of an oil lubrication and hydraulic systems manufacturer
Cloud-enabled tools developed in the Cloud Collaborative Manufacturing Networks (C2NET) project address the needs of small and medium enterprises with respect to information exchange and visibility across the collaboration partners in the supply network, coupled with automated and collaborative production planning and supply management. This paper analyses a case of an oil lubrication and hydraulic systems manufacturer and describes a pilot application of C2NET where the production schedule is optimized according to the priorities of the pilot company. In this case the goal is a highly adaptive just-in-time manufacturing schedule with guaranteed on time delivery.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Urban-architect role in smart-city context literature review and case studies UX-FFE model: An experimentation of a new innovation process dedicated to a mature industrial company An examination of barriers to business model innovation Distributed software development of a cloud solution for collaborative manufacturing networks Testing and selecting mixed data type DEA scenarios with PCA post-processing
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1