J. Coulondre, R. Le-Port, N. Maruejouls, A. Videau, A. Bondarenko, V. Guerikh
{"title":"两个大系统之间可盈利的电力交换和可用的传输容量:欧洲TESIS-UPS互连的例子","authors":"J. Coulondre, R. Le-Port, N. Maruejouls, A. Videau, A. Bondarenko, V. Guerikh","doi":"10.1109/PTC.1999.826436","DOIUrl":null,"url":null,"abstract":"The TESIS-UPS interconnection Project aimed at assessing the requirements and the feasibility of synchronous interconnection between the Trans European Synchronously Interconnected System (TESIS) system and the Unified Power System (UPS). It is financed by the European Community (TACIS fund). As a first stage of this study, the combination of an economical analysis together with a network study allow to assess clearly the level of exchanges together with the network consistency to be considered.","PeriodicalId":101688,"journal":{"name":"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)","volume":"121 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-08-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Profitable power exchanges and available transmission capacity between two large systems: the example of the European TESIS-UPS Interconnection\",\"authors\":\"J. Coulondre, R. Le-Port, N. Maruejouls, A. Videau, A. Bondarenko, V. Guerikh\",\"doi\":\"10.1109/PTC.1999.826436\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The TESIS-UPS interconnection Project aimed at assessing the requirements and the feasibility of synchronous interconnection between the Trans European Synchronously Interconnected System (TESIS) system and the Unified Power System (UPS). It is financed by the European Community (TACIS fund). As a first stage of this study, the combination of an economical analysis together with a network study allow to assess clearly the level of exchanges together with the network consistency to be considered.\",\"PeriodicalId\":101688,\"journal\":{\"name\":\"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)\",\"volume\":\"121 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-08-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PTC.1999.826436\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PTC.1999.826436","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Profitable power exchanges and available transmission capacity between two large systems: the example of the European TESIS-UPS Interconnection
The TESIS-UPS interconnection Project aimed at assessing the requirements and the feasibility of synchronous interconnection between the Trans European Synchronously Interconnected System (TESIS) system and the Unified Power System (UPS). It is financed by the European Community (TACIS fund). As a first stage of this study, the combination of an economical analysis together with a network study allow to assess clearly the level of exchanges together with the network consistency to be considered.