mobagu镇大型汽车厂附近的街道和十字路口的性能研究

Ahmadil Fitrah
{"title":"mobagu镇大型汽车厂附近的街道和十字路口的性能研究","authors":"Ahmadil Fitrah","doi":"10.31850/karajata.v2i1.1293","DOIUrl":null,"url":null,"abstract":"Abstract \nToko Perkasa Raja Motor is a type of activity center in the form of a building intended for motorized vehicle workshops located on the Molinow Urban Village, Kotamobagu Barat District, Kotamobagu City with a building floor area of 640 m2, which will develop in front of the current location with a land area of 374 m2. With this development it is estimated that it has an influence on the surrounding traffic, so an analysis of the performance of roads and intersections is carried out to determine traffic volume and identify changes in road and intersection service levels due to development impacts. The results of the analysis show that the highest traffic volume occurs on Thursday 4 February 2021, peak hours at 10.00-11.00 WITA with a total vehicle of 244 vehicles / hour or 129.10 pcu / hour and the lowest is 72.20 pcu / hour at 17.00-18.00 WITA. The level of service in segment 1 Jalan Kampus has a V/C ratio of 0.04 or LoS A, at segment 2 intersection 3 Jalan Kampus-Jalan Rawa Mangun, the value of V/C ratio is 0.07 or LoS A, at segment 3 intersection 4 Jalan Kampus-Jalan Amal-Jalan Adampe Dolot has a V/C ratio value of 0.18 or LoS A.","PeriodicalId":231362,"journal":{"name":"Jurnal Karajata Engineering","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-01-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"STUDI KINERJA RUAS JALAN DAN SIMPANG SEKITAR BENGKEL TOKO PERKASA RAJA MOTOR KOTA KOTAMOBAGU\",\"authors\":\"Ahmadil Fitrah\",\"doi\":\"10.31850/karajata.v2i1.1293\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract \\nToko Perkasa Raja Motor is a type of activity center in the form of a building intended for motorized vehicle workshops located on the Molinow Urban Village, Kotamobagu Barat District, Kotamobagu City with a building floor area of 640 m2, which will develop in front of the current location with a land area of 374 m2. With this development it is estimated that it has an influence on the surrounding traffic, so an analysis of the performance of roads and intersections is carried out to determine traffic volume and identify changes in road and intersection service levels due to development impacts. The results of the analysis show that the highest traffic volume occurs on Thursday 4 February 2021, peak hours at 10.00-11.00 WITA with a total vehicle of 244 vehicles / hour or 129.10 pcu / hour and the lowest is 72.20 pcu / hour at 17.00-18.00 WITA. The level of service in segment 1 Jalan Kampus has a V/C ratio of 0.04 or LoS A, at segment 2 intersection 3 Jalan Kampus-Jalan Rawa Mangun, the value of V/C ratio is 0.07 or LoS A, at segment 3 intersection 4 Jalan Kampus-Jalan Amal-Jalan Adampe Dolot has a V/C ratio value of 0.18 or LoS A.\",\"PeriodicalId\":231362,\"journal\":{\"name\":\"Jurnal Karajata Engineering\",\"volume\":\"56 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-01-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Karajata Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31850/karajata.v2i1.1293\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Karajata Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31850/karajata.v2i1.1293","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

Toko Perkasa Raja Motor是一座机动车辆车间建筑形式的活动中心,位于Kotamobagu Barat区的Molinow城中村,建筑面积为640平方米,将在现有位置前开发,占地面积为374平方米。随着这一发展,估计它会对周围的交通产生影响,因此对道路和十字路口的性能进行分析,以确定交通量,并确定由于开发影响而导致的道路和十字路口服务水平的变化。分析结果表明,2021年2月4日(星期四)交通流量最高,高峰时段为10.00-11.00 WITA,车辆总数为244辆/小时,即129.10 pcu /小时,最低时段为17.00-18.00 WITA,为72.20 pcu /小时。Jalan Kampus路段1的服务水平V/C比值为0.04或LoS a, Jalan Kampus-Jalan Rawa Mangun路段2交叉口3的服务水平V/C比值为0.07或LoS a, Jalan Kampus-Jalan Amal-Jalan Adampe Dolot路段3的服务水平V/C比值为0.18或LoS a。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
STUDI KINERJA RUAS JALAN DAN SIMPANG SEKITAR BENGKEL TOKO PERKASA RAJA MOTOR KOTA KOTAMOBAGU
Abstract Toko Perkasa Raja Motor is a type of activity center in the form of a building intended for motorized vehicle workshops located on the Molinow Urban Village, Kotamobagu Barat District, Kotamobagu City with a building floor area of 640 m2, which will develop in front of the current location with a land area of 374 m2. With this development it is estimated that it has an influence on the surrounding traffic, so an analysis of the performance of roads and intersections is carried out to determine traffic volume and identify changes in road and intersection service levels due to development impacts. The results of the analysis show that the highest traffic volume occurs on Thursday 4 February 2021, peak hours at 10.00-11.00 WITA with a total vehicle of 244 vehicles / hour or 129.10 pcu / hour and the lowest is 72.20 pcu / hour at 17.00-18.00 WITA. The level of service in segment 1 Jalan Kampus has a V/C ratio of 0.04 or LoS A, at segment 2 intersection 3 Jalan Kampus-Jalan Rawa Mangun, the value of V/C ratio is 0.07 or LoS A, at segment 3 intersection 4 Jalan Kampus-Jalan Amal-Jalan Adampe Dolot has a V/C ratio value of 0.18 or LoS A.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
PENGENDALIAN WAKTU DAN BIAYA DENGAN METODE EARNED VALUE ANALYSIS PADA PEKERJAAN PEMBANGUNAN SUPERVISI KONSTRUKSI PENINGKATAN JALAN RUAS KOTU - LABA PERENCANAAN PENCEGAHAN TANAH LONGSOR DENGAN METODE DINDING PENAHAN TANAH ANALISIS KETERSEDIAAN LAHAN TERBUKA HIJAU BAGI PERTUMBUHAN PENDUDUK DI KECAMATAN TEMPE KAB.WAJO MENGGUNAKAN APLIKASI SISTEM INFORMASI GEOGRAFIS (SIG) SISTEM PENGELOLAAN TERMINAL TIPE A KECAMATAN TANETE RILAU ANALISIS SEDIMENTASI PADA BENDUNG AWO KABUPATEN WAJO
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1