预付现金-信用支付方案下的供应链网络设计

Yu-Chung Tsao, Aisyah Dewi Muthi'ah, N. Arvitrida
{"title":"预付现金-信用支付方案下的供应链网络设计","authors":"Yu-Chung Tsao, Aisyah Dewi Muthi'ah, N. Arvitrida","doi":"10.1145/3335550.3335575","DOIUrl":null,"url":null,"abstract":"The increase of e-commerce activities affects many aspects of supply chain decisions, including payment term alternatives. There are many variations of payment terms used in e-commerce practices. The vendor may offer the retailer a combination of several payment terms. It may consist of an advance-cash-credit (ACC) payment scheme, which means that the buyer needs to pay a fraction of the purchasing cost before he receives the item (advance payment). The other payment alternatives are enabling the buyer whether to pay some cash when the item is arrived (cash on delivery), and/or to pay the remaining purchasing cost after a credit period (credit payment). This paper investigates the effect of payment schemes on the supply chain network design. The network consists of an outside supplier, multiple DC's, and multiple retailers. The distribution centers receive an upstream ACC payment from the supplier. The problem is to determine the optimum location, allocation, as well as the inventory cycle time with the objective function of minimize total cost. A continuous approximation is used in the model development, and the concept of time value of money concept is considered. The numerical example is used to demonstrate the solution approach. This paper provides modeling approach that supply chain network designer can use as a reference.","PeriodicalId":312704,"journal":{"name":"Proceedings of the 2019 International Conference on Management Science and Industrial Engineering - MSIE 2019","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A Supply Chain Network Design Under Advance-Cash-Credit Payment Scheme\",\"authors\":\"Yu-Chung Tsao, Aisyah Dewi Muthi'ah, N. Arvitrida\",\"doi\":\"10.1145/3335550.3335575\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The increase of e-commerce activities affects many aspects of supply chain decisions, including payment term alternatives. There are many variations of payment terms used in e-commerce practices. The vendor may offer the retailer a combination of several payment terms. It may consist of an advance-cash-credit (ACC) payment scheme, which means that the buyer needs to pay a fraction of the purchasing cost before he receives the item (advance payment). The other payment alternatives are enabling the buyer whether to pay some cash when the item is arrived (cash on delivery), and/or to pay the remaining purchasing cost after a credit period (credit payment). This paper investigates the effect of payment schemes on the supply chain network design. The network consists of an outside supplier, multiple DC's, and multiple retailers. The distribution centers receive an upstream ACC payment from the supplier. The problem is to determine the optimum location, allocation, as well as the inventory cycle time with the objective function of minimize total cost. A continuous approximation is used in the model development, and the concept of time value of money concept is considered. The numerical example is used to demonstrate the solution approach. This paper provides modeling approach that supply chain network designer can use as a reference.\",\"PeriodicalId\":312704,\"journal\":{\"name\":\"Proceedings of the 2019 International Conference on Management Science and Industrial Engineering - MSIE 2019\",\"volume\":\"20 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-05-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 2019 International Conference on Management Science and Industrial Engineering - MSIE 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/3335550.3335575\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2019 International Conference on Management Science and Industrial Engineering - MSIE 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3335550.3335575","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

电子商务活动的增加影响了供应链决策的许多方面,包括支付条件的选择。在电子商务实践中有许多不同的付款条件。卖方可以向零售商提供几种付款条件的组合。它可能包括预付现金信用(ACC)支付方案,这意味着买方在收到物品之前需要支付购买成本的一小部分(预付款)。其他付款选择是使买方能够在物品到达时支付一些现金(货到付款),和/或在信用期后支付剩余的购买成本(信用付款)。本文研究了支付方案对供应链网络设计的影响。该网络由一个外部供应商、多个DC和多个零售商组成。配送中心从供应商那里收到上游ACC付款。问题是在总成本最小的目标函数下确定最优的位置、配置和库存周期时间。在模型开发中采用了连续逼近,并考虑了货币概念的时间价值概念。用数值算例说明了求解方法。本文提供的建模方法可供供应链网络设计者参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A Supply Chain Network Design Under Advance-Cash-Credit Payment Scheme
The increase of e-commerce activities affects many aspects of supply chain decisions, including payment term alternatives. There are many variations of payment terms used in e-commerce practices. The vendor may offer the retailer a combination of several payment terms. It may consist of an advance-cash-credit (ACC) payment scheme, which means that the buyer needs to pay a fraction of the purchasing cost before he receives the item (advance payment). The other payment alternatives are enabling the buyer whether to pay some cash when the item is arrived (cash on delivery), and/or to pay the remaining purchasing cost after a credit period (credit payment). This paper investigates the effect of payment schemes on the supply chain network design. The network consists of an outside supplier, multiple DC's, and multiple retailers. The distribution centers receive an upstream ACC payment from the supplier. The problem is to determine the optimum location, allocation, as well as the inventory cycle time with the objective function of minimize total cost. A continuous approximation is used in the model development, and the concept of time value of money concept is considered. The numerical example is used to demonstrate the solution approach. This paper provides modeling approach that supply chain network designer can use as a reference.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Comparative Study of Object Recognition Techniques: Softmax, Linear and Quadratic Discriminant Analysis Based on Convolutional Neural Network Feature Extraction Analysis of Curvature Effect on C-Shaped Buildings Reliability Analysis and Maintenance Engineering of Anti-rear Device Based on Fuzzy FMECA Application of Value Engineering (VE) Technique to Reduce Cost in Case of Forklift's Tire Replacement A Numerical Tool for Assessing Disaster Related Injuries and Personal Protective Clothing
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1