{"title":"公寓开发项目风险管理的实施","authors":"Akromul Khaidar, F. Rahmawati, M. Aziza, Sidik Ismanu","doi":"10.2991/aebmr.k.210717.034","DOIUrl":null,"url":null,"abstract":"Risk is difficult to predict in construction projects, so it requires a risk analysis. The first risk analysis carried out is the identification of risks to the project. This research uses qualitative methods and risk assessment and to makes a risk register. The results showed that the company carried out mitigation at certain stages, especially at extreme risk and high risk, which needed special attention because this risk would significantly impact project implementation. After mitigation, projects that have a high level of risk and inherent probability have decreased. Keywords—risk management, risk register, construction risk","PeriodicalId":433214,"journal":{"name":"Proceedings of 2nd Annual Management, Business and Economic Conference (AMBEC 2020)","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Implementation of Risk Management in Apartments Development Projects\",\"authors\":\"Akromul Khaidar, F. Rahmawati, M. Aziza, Sidik Ismanu\",\"doi\":\"10.2991/aebmr.k.210717.034\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Risk is difficult to predict in construction projects, so it requires a risk analysis. The first risk analysis carried out is the identification of risks to the project. This research uses qualitative methods and risk assessment and to makes a risk register. The results showed that the company carried out mitigation at certain stages, especially at extreme risk and high risk, which needed special attention because this risk would significantly impact project implementation. After mitigation, projects that have a high level of risk and inherent probability have decreased. Keywords—risk management, risk register, construction risk\",\"PeriodicalId\":433214,\"journal\":{\"name\":\"Proceedings of 2nd Annual Management, Business and Economic Conference (AMBEC 2020)\",\"volume\":\"21 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-07-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of 2nd Annual Management, Business and Economic Conference (AMBEC 2020)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2991/aebmr.k.210717.034\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of 2nd Annual Management, Business and Economic Conference (AMBEC 2020)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2991/aebmr.k.210717.034","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Implementation of Risk Management in Apartments Development Projects
Risk is difficult to predict in construction projects, so it requires a risk analysis. The first risk analysis carried out is the identification of risks to the project. This research uses qualitative methods and risk assessment and to makes a risk register. The results showed that the company carried out mitigation at certain stages, especially at extreme risk and high risk, which needed special attention because this risk would significantly impact project implementation. After mitigation, projects that have a high level of risk and inherent probability have decreased. Keywords—risk management, risk register, construction risk