大容量电力规划中输电拥塞定价缓解系统稳定性约束

K. Sayler, S. Halpin, J. Valenzuela, C.S. Park
{"title":"大容量电力规划中输电拥塞定价缓解系统稳定性约束","authors":"K. Sayler, S. Halpin, J. Valenzuela, C.S. Park","doi":"10.1109/SSST.2004.1295660","DOIUrl":null,"url":null,"abstract":"The quantity of power traded in the wholesale energy market went from almost nothing in 1994 to over 800 TWh in 2000 but there has been relatively little investment in transmission infrastructure during that time. Consequently, the transmission system is becoming increasingly more constrained resulting in reduced import capability, heavily loaded lines, and stability problems. Any effort to reduce transmission congestion may provide benefits in customer choice and economic efficiency in power operation, but it will also provide new challenges for bulk-power system reliability. As generation continues to increase in localized areas, export limits will be encountered initially in the form of thermal constraints on transmission lines. Continuing to add generation into a constant effective system impedance will threaten a system stability limit. The focus of this paper is on developing proper pricing signals that may encourage generator operation in ways favorable to power system security. The well-developed locational marginal pricing concept is adopted as a basis and expanded to include constraints associated with system stability.","PeriodicalId":309617,"journal":{"name":"Thirty-Sixth Southeastern Symposium on System Theory, 2004. Proceedings of the","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2004-09-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Pricing transmission congestion to alleviate system stability constraints in bulk power planning\",\"authors\":\"K. Sayler, S. Halpin, J. Valenzuela, C.S. Park\",\"doi\":\"10.1109/SSST.2004.1295660\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The quantity of power traded in the wholesale energy market went from almost nothing in 1994 to over 800 TWh in 2000 but there has been relatively little investment in transmission infrastructure during that time. Consequently, the transmission system is becoming increasingly more constrained resulting in reduced import capability, heavily loaded lines, and stability problems. Any effort to reduce transmission congestion may provide benefits in customer choice and economic efficiency in power operation, but it will also provide new challenges for bulk-power system reliability. As generation continues to increase in localized areas, export limits will be encountered initially in the form of thermal constraints on transmission lines. Continuing to add generation into a constant effective system impedance will threaten a system stability limit. The focus of this paper is on developing proper pricing signals that may encourage generator operation in ways favorable to power system security. The well-developed locational marginal pricing concept is adopted as a basis and expanded to include constraints associated with system stability.\",\"PeriodicalId\":309617,\"journal\":{\"name\":\"Thirty-Sixth Southeastern Symposium on System Theory, 2004. Proceedings of the\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2004-09-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Thirty-Sixth Southeastern Symposium on System Theory, 2004. Proceedings of the\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SSST.2004.1295660\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Thirty-Sixth Southeastern Symposium on System Theory, 2004. Proceedings of the","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SSST.2004.1295660","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

在批发能源市场上交易的电量从1994年几乎为零到2000年超过800太瓦时,但在此期间对输电基础设施的投资相对较少。因此,输电系统越来越受到限制,导致进口能力下降、线路负荷过重和稳定性问题。任何减少输电拥塞的努力都可以在用户选择和电力运行的经济效率方面带来好处,但也会对大容量电力系统的可靠性提出新的挑战。随着局部地区发电量的持续增加,出口限制最初将以输电线路的热约束形式遇到。继续将发电量增加到一个恒定的有效系统阻抗将威胁到系统的稳定性极限。本文的重点是制定适当的定价信号,以鼓励发电机以有利于电力系统安全的方式运行。采用成熟的位置边际定价概念作为基础,并扩展到包括与系统稳定性相关的约束。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Pricing transmission congestion to alleviate system stability constraints in bulk power planning
The quantity of power traded in the wholesale energy market went from almost nothing in 1994 to over 800 TWh in 2000 but there has been relatively little investment in transmission infrastructure during that time. Consequently, the transmission system is becoming increasingly more constrained resulting in reduced import capability, heavily loaded lines, and stability problems. Any effort to reduce transmission congestion may provide benefits in customer choice and economic efficiency in power operation, but it will also provide new challenges for bulk-power system reliability. As generation continues to increase in localized areas, export limits will be encountered initially in the form of thermal constraints on transmission lines. Continuing to add generation into a constant effective system impedance will threaten a system stability limit. The focus of this paper is on developing proper pricing signals that may encourage generator operation in ways favorable to power system security. The well-developed locational marginal pricing concept is adopted as a basis and expanded to include constraints associated with system stability.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Clutter complexity analysis of hyper-spectral bands Performance analysis of UNIX user datagram protocol implementations On the complexity and accuracy of motion estimation using Lie operators Real time modeling and control of circulating fluidized bed Vehicle lateral control using a double integrator control strategy
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1