{"title":"分布式发电和需求响应对配电网规划的影响","authors":"M. Rey, S. M. de Oca, Á. Giusto, M. Vignolo","doi":"10.1109/TDC-LA.2018.8511660","DOIUrl":null,"url":null,"abstract":"This paper studies the possible benefits/overcharges for a Distribution Network Operator (DNO) in the process of Planning the Distribution Network, when Distributed Generation (DG), and/or Demand Response (DR) policies are incorporated in the Distribution network. The results obtained for the design of the new grid with this participation are incorporated into the network planning process with different types of DG power plants and DR in their demand nodes, compared with the base case of demand obtained in the case of a network without changes in their consumption patterns neither DG incorporation. For the planning process of the new network in either cases, the classic Distribution Network Planning methodology was used, which is based on the classic economic theory of Minimum Total Cost (MTC) through which the Investment Plan of the Distribution Network of the Electrical Distribution Company is drawn up. The solutions obtained guarantee the supply of the power and energy demand of its customers at all times (all scenarios), minimizing the total cost equation and complying with the physical design constraints during the network planning horizon of 20 years. A genetic algorithm (GA) was used to search for the optimal solution (minim total cost) in a technical-economic point of view of the electricity network.","PeriodicalId":267301,"journal":{"name":"2018 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D-LA)","volume":"140 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Distributed Generation and Demand Response Effects on the Distribution Network Planning\",\"authors\":\"M. Rey, S. M. de Oca, Á. Giusto, M. Vignolo\",\"doi\":\"10.1109/TDC-LA.2018.8511660\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper studies the possible benefits/overcharges for a Distribution Network Operator (DNO) in the process of Planning the Distribution Network, when Distributed Generation (DG), and/or Demand Response (DR) policies are incorporated in the Distribution network. The results obtained for the design of the new grid with this participation are incorporated into the network planning process with different types of DG power plants and DR in their demand nodes, compared with the base case of demand obtained in the case of a network without changes in their consumption patterns neither DG incorporation. For the planning process of the new network in either cases, the classic Distribution Network Planning methodology was used, which is based on the classic economic theory of Minimum Total Cost (MTC) through which the Investment Plan of the Distribution Network of the Electrical Distribution Company is drawn up. The solutions obtained guarantee the supply of the power and energy demand of its customers at all times (all scenarios), minimizing the total cost equation and complying with the physical design constraints during the network planning horizon of 20 years. A genetic algorithm (GA) was used to search for the optimal solution (minim total cost) in a technical-economic point of view of the electricity network.\",\"PeriodicalId\":267301,\"journal\":{\"name\":\"2018 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D-LA)\",\"volume\":\"140 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D-LA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC-LA.2018.8511660\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D-LA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC-LA.2018.8511660","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文研究了当分布式发电(DG)和需求响应(DR)政策被纳入配电网时,配电网运营商(DNO)在配电网规划过程中可能获得的收益/超额收费。在这种参与下,新电网的设计结果被纳入不同类型的DG发电厂和DR在其需求节点的网络规划过程中,与不改变其消费模式的情况下获得的需求基本情况进行比较。对于这两种情况下新电网的规划过程,采用了经典的配电网规划方法,该方法基于经典的总成本最小(MTC)经济学理论,通过该方法制定配电公司配电网的投资计划。所获得的解决方案在20年的网络规划周期内,保证了客户在任何时间(所有场景)的电力和能源需求的供应,最小化了总成本方程,并符合物理设计约束。采用遗传算法从技术经济角度寻找电网的最优解(总成本最小)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Distributed Generation and Demand Response Effects on the Distribution Network Planning
This paper studies the possible benefits/overcharges for a Distribution Network Operator (DNO) in the process of Planning the Distribution Network, when Distributed Generation (DG), and/or Demand Response (DR) policies are incorporated in the Distribution network. The results obtained for the design of the new grid with this participation are incorporated into the network planning process with different types of DG power plants and DR in their demand nodes, compared with the base case of demand obtained in the case of a network without changes in their consumption patterns neither DG incorporation. For the planning process of the new network in either cases, the classic Distribution Network Planning methodology was used, which is based on the classic economic theory of Minimum Total Cost (MTC) through which the Investment Plan of the Distribution Network of the Electrical Distribution Company is drawn up. The solutions obtained guarantee the supply of the power and energy demand of its customers at all times (all scenarios), minimizing the total cost equation and complying with the physical design constraints during the network planning horizon of 20 years. A genetic algorithm (GA) was used to search for the optimal solution (minim total cost) in a technical-economic point of view of the electricity network.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Sizing of Neutral Reactors for Magnetically Controlled Shunt Reactors Connected Directly to Power Lines The Solar eclipse of August 21, 2017 in Honduras: Evidence of the impact on the power system operation Battery Energy Storage for Frequency Support in the BCS Electric Power System Optimal Distribution Systems Expansion Planning for Improving Service Restoration Planning of must-run units and optimal load shedding to maintain the security in power systems
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1