利用灵活性提高医院基础设施投资的物有所值

R. de Neufville, Y. S. Lee, S. Scholtes
{"title":"利用灵活性提高医院基础设施投资的物有所值","authors":"R. de Neufville, Y. S. Lee, S. Scholtes","doi":"10.1109/INFRA.2008.5439668","DOIUrl":null,"url":null,"abstract":"Flexibility is an important value driver for hospital infrastructure in a highly unpredictable health care environment. We illustrate this by way of a case study based on the development of a major UK teaching hospital over the past 80 years. We then lay out some principles for the articulation of the value of flexibility to enable the designer to make an economic case for a flexible infrastructure. Finally, we argue that hospital procurement under Public Private Partnership (PPP), in particular under the UK Private Finance Initiative (PFI), can be an inhibitor to the design and development of flexible infrastructure. To realize the value of flexible infrastructure systems, the PFI parties need to create a genuine long-term partnership. The private parties have to stay engaged during the lifetime of the infrastructure to help adapt it to developing circumstances and thereby minimize value risks, maximize opportunities if and when they arise, and allow the public sector to reap as much social benefit from the infrastructure as possible.","PeriodicalId":207041,"journal":{"name":"2008 First International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"27","resultStr":"{\"title\":\"Using flexibility to improve value-for-money in hospital infrastructure investments\",\"authors\":\"R. de Neufville, Y. S. Lee, S. Scholtes\",\"doi\":\"10.1109/INFRA.2008.5439668\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Flexibility is an important value driver for hospital infrastructure in a highly unpredictable health care environment. We illustrate this by way of a case study based on the development of a major UK teaching hospital over the past 80 years. We then lay out some principles for the articulation of the value of flexibility to enable the designer to make an economic case for a flexible infrastructure. Finally, we argue that hospital procurement under Public Private Partnership (PPP), in particular under the UK Private Finance Initiative (PFI), can be an inhibitor to the design and development of flexible infrastructure. To realize the value of flexible infrastructure systems, the PFI parties need to create a genuine long-term partnership. The private parties have to stay engaged during the lifetime of the infrastructure to help adapt it to developing circumstances and thereby minimize value risks, maximize opportunities if and when they arise, and allow the public sector to reap as much social benefit from the infrastructure as possible.\",\"PeriodicalId\":207041,\"journal\":{\"name\":\"2008 First International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"27\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 First International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INFRA.2008.5439668\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 First International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INFRA.2008.5439668","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 27

摘要

在高度不可预测的医疗保健环境中,灵活性是医院基础设施的重要价值驱动因素。我们通过一个基于过去80年英国主要教学医院发展的案例研究来说明这一点。然后,我们为灵活性的价值阐述了一些原则,使设计师能够为灵活的基础设施制定经济案例。最后,我们认为公私合作伙伴关系(PPP)下的医院采购,特别是英国私人融资倡议(PFI)下的医院采购,可能会阻碍灵活基础设施的设计和开发。为了实现灵活基础设施系统的价值,PFI各方需要建立真正的长期合作伙伴关系。私营部门必须在基础设施的生命周期内保持参与,以帮助其适应不断发展的环境,从而最大限度地降低价值风险,在机会出现时最大化机会,并允许公共部门从基础设施中获得尽可能多的社会效益。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Using flexibility to improve value-for-money in hospital infrastructure investments
Flexibility is an important value driver for hospital infrastructure in a highly unpredictable health care environment. We illustrate this by way of a case study based on the development of a major UK teaching hospital over the past 80 years. We then lay out some principles for the articulation of the value of flexibility to enable the designer to make an economic case for a flexible infrastructure. Finally, we argue that hospital procurement under Public Private Partnership (PPP), in particular under the UK Private Finance Initiative (PFI), can be an inhibitor to the design and development of flexible infrastructure. To realize the value of flexible infrastructure systems, the PFI parties need to create a genuine long-term partnership. The private parties have to stay engaged during the lifetime of the infrastructure to help adapt it to developing circumstances and thereby minimize value risks, maximize opportunities if and when they arise, and allow the public sector to reap as much social benefit from the infrastructure as possible.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Asset management stewardship: The effectiveness of public-private mix governance structures Developing robust Intelligent Speed Adaptation policies within a multi-stakeholder context: An application of exploratory modeling Agent coordination for supply and demand match in microgrids with auction mechanism Anticipation for efficient electricity transmission network investments Implementation of cross-border balancing in Europe
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1