{"title":"可持续私人融资倡议合同","authors":"M. Ros, Z. Ismail, F. Hassan, M. C. Mat","doi":"10.1109/ISBEIA.2011.6088857","DOIUrl":null,"url":null,"abstract":"One critical element of PFI projects is the contract which binds the Special Purpose Vehicle (SPV) (project promoter) with the government (client). Drawing up the PFI contract is by no means a simple undertaking because elements of economy, social, technological and intellectual considerations will have to be coherently spelt out. Adding on to this now is the requirement to include sustainable considerations. However, this can be very vexing because sustainable project elements can have serious implications to the project implementation process, costing and viability.","PeriodicalId":358440,"journal":{"name":"2011 IEEE Symposium on Business, Engineering and Industrial Applications (ISBEIA)","volume":"237 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Sustainable private financing initiative contracts\",\"authors\":\"M. Ros, Z. Ismail, F. Hassan, M. C. Mat\",\"doi\":\"10.1109/ISBEIA.2011.6088857\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"One critical element of PFI projects is the contract which binds the Special Purpose Vehicle (SPV) (project promoter) with the government (client). Drawing up the PFI contract is by no means a simple undertaking because elements of economy, social, technological and intellectual considerations will have to be coherently spelt out. Adding on to this now is the requirement to include sustainable considerations. However, this can be very vexing because sustainable project elements can have serious implications to the project implementation process, costing and viability.\",\"PeriodicalId\":358440,\"journal\":{\"name\":\"2011 IEEE Symposium on Business, Engineering and Industrial Applications (ISBEIA)\",\"volume\":\"237 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 IEEE Symposium on Business, Engineering and Industrial Applications (ISBEIA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISBEIA.2011.6088857\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 IEEE Symposium on Business, Engineering and Industrial Applications (ISBEIA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISBEIA.2011.6088857","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

PFI项目的一个关键要素是将特殊目的机构(SPV)(项目发起人)与政府(客户)绑定在一起的合同。起草PFI合同绝不是一项简单的任务,因为经济、社会、技术和知识方面的考虑因素必须连贯地阐明。除此之外,现在还需要包括可持续的考虑因素。然而,这可能非常令人烦恼,因为可持续项目要素可能对项目实施过程、成本和可行性产生严重影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Sustainable private financing initiative contracts
One critical element of PFI projects is the contract which binds the Special Purpose Vehicle (SPV) (project promoter) with the government (client). Drawing up the PFI contract is by no means a simple undertaking because elements of economy, social, technological and intellectual considerations will have to be coherently spelt out. Adding on to this now is the requirement to include sustainable considerations. However, this can be very vexing because sustainable project elements can have serious implications to the project implementation process, costing and viability.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
An integrated approach of analysing a production system's PMS: A case study A conceptual paper for human capital in the logistics industry in Malaysia Monitoring visitor impacts in Imbak Canyon Conservation Area, Sabah, Malaysia Buildability problems in the Malaysian building construction The impact of subprime mortgage crisis on the short-run and long-run volatility components of the Malaysian stock market
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1