{"title":"TNB新投入使用的联合循环发电厂的性能退化研究-以波德申Tuanku Jaafar发电厂PD1为例","authors":"C. H. Lee, Z. A. Mamat","doi":"10.1109/ICEENVIRON.2009.5398657","DOIUrl":null,"url":null,"abstract":"Phase 1 of Tuanku Jaafar Power Station, Port Dickson (PD1) is one of the newest power plants in Tenaga Nasional Berhad (TNB). This combined cycle plant with the nominal capacity of 750MW started its commercial operation in 2005. However, in less than 2 years of its operation, the plant has indicated significant capacity degradation. Consequently, TNB carried few investigations to determine the cause for the capacity degradation. This paper describes the approach taken and the outcomes of the investigations.","PeriodicalId":211736,"journal":{"name":"2009 3rd International Conference on Energy and Environment (ICEE)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2009-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Investigation of performance degradation for TNB newly commissioned combined cycle power plant Case study at PD1, Tuanku Jaafar Power Station, Port Dickson\",\"authors\":\"C. H. Lee, Z. A. Mamat\",\"doi\":\"10.1109/ICEENVIRON.2009.5398657\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Phase 1 of Tuanku Jaafar Power Station, Port Dickson (PD1) is one of the newest power plants in Tenaga Nasional Berhad (TNB). This combined cycle plant with the nominal capacity of 750MW started its commercial operation in 2005. However, in less than 2 years of its operation, the plant has indicated significant capacity degradation. Consequently, TNB carried few investigations to determine the cause for the capacity degradation. This paper describes the approach taken and the outcomes of the investigations.\",\"PeriodicalId\":211736,\"journal\":{\"name\":\"2009 3rd International Conference on Energy and Environment (ICEE)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 3rd International Conference on Energy and Environment (ICEE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICEENVIRON.2009.5398657\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 3rd International Conference on Energy and Environment (ICEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICEENVIRON.2009.5398657","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Investigation of performance degradation for TNB newly commissioned combined cycle power plant Case study at PD1, Tuanku Jaafar Power Station, Port Dickson
Phase 1 of Tuanku Jaafar Power Station, Port Dickson (PD1) is one of the newest power plants in Tenaga Nasional Berhad (TNB). This combined cycle plant with the nominal capacity of 750MW started its commercial operation in 2005. However, in less than 2 years of its operation, the plant has indicated significant capacity degradation. Consequently, TNB carried few investigations to determine the cause for the capacity degradation. This paper describes the approach taken and the outcomes of the investigations.