S. I. Vagropoulos, C. K. Simoglou, A. Bakirtzis, E.J. Thalassinakis, A. Gigantidou
{"title":"蓄电池储能系统对克里特岛电力系统调度和运行的影响评估","authors":"S. I. Vagropoulos, C. K. Simoglou, A. Bakirtzis, E.J. Thalassinakis, A. Gigantidou","doi":"10.1109/UPEC.2014.6934746","DOIUrl":null,"url":null,"abstract":"This paper examines the impact that the installation of battery energy storage systems (BESSs) has on the daily scheduling and operation of the insular power system of Crete. An optimization model for the integration of BESS in the day-ahead unit commitment problem of isolated power systems is developed and annual simulations are carried out for BESSs of different dimensioning regarding power, capacity and efficiency. Simulation results for load leveling and reserve provision from BESS are presented and thoroughly discussed.","PeriodicalId":414838,"journal":{"name":"2014 49th International Universities Power Engineering Conference (UPEC)","volume":"37 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-10-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Assessment of the impact of a battery energy storage system on the scheduling and operation of the insular power system of Crete\",\"authors\":\"S. I. Vagropoulos, C. K. Simoglou, A. Bakirtzis, E.J. Thalassinakis, A. Gigantidou\",\"doi\":\"10.1109/UPEC.2014.6934746\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper examines the impact that the installation of battery energy storage systems (BESSs) has on the daily scheduling and operation of the insular power system of Crete. An optimization model for the integration of BESS in the day-ahead unit commitment problem of isolated power systems is developed and annual simulations are carried out for BESSs of different dimensioning regarding power, capacity and efficiency. Simulation results for load leveling and reserve provision from BESS are presented and thoroughly discussed.\",\"PeriodicalId\":414838,\"journal\":{\"name\":\"2014 49th International Universities Power Engineering Conference (UPEC)\",\"volume\":\"37 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-10-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 49th International Universities Power Engineering Conference (UPEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/UPEC.2014.6934746\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 49th International Universities Power Engineering Conference (UPEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UPEC.2014.6934746","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Assessment of the impact of a battery energy storage system on the scheduling and operation of the insular power system of Crete
This paper examines the impact that the installation of battery energy storage systems (BESSs) has on the daily scheduling and operation of the insular power system of Crete. An optimization model for the integration of BESS in the day-ahead unit commitment problem of isolated power systems is developed and annual simulations are carried out for BESSs of different dimensioning regarding power, capacity and efficiency. Simulation results for load leveling and reserve provision from BESS are presented and thoroughly discussed.