{"title":"基于层次分析法的桩基工程风险管理","authors":"Alitra, Resmi Bestari, Bambang Purwoko K.B","doi":"10.31695/ijerat.2019.3445","DOIUrl":null,"url":null,"abstract":"ABSTRACT Risk factors as the cause of the condition are not expected to cause any harm, damage or loss. The measure of risk based on the probability of failure of structural and monetary consequences of failure, and accounts for the material damage from time to time. The purpose of this study was to determine the factors (events that enable the) risk on pile foundation work and determine the weight/risk priority ranking of pile foundation work execution. This study uses analysis Analytical Hierarchy Process (AHP) to obtain risk factors pile foundation dominant conveyor manufacturing building consisting of 21 risk factors (criteria). The risk assessment carried out by 5 (five) Expert. The results in getting the expert assessment of the risk factors pile foundation work of the most dominant is the criterion of cost control systems are a weak and weak time control system.","PeriodicalId":424923,"journal":{"name":"International Journal of Engineering Research and Advanced Technology","volume":"38 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Risk Management of Pile Foundation Work Using Analytical Hierarchy Process Method (AHP)\",\"authors\":\"Alitra, Resmi Bestari, Bambang Purwoko K.B\",\"doi\":\"10.31695/ijerat.2019.3445\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT Risk factors as the cause of the condition are not expected to cause any harm, damage or loss. The measure of risk based on the probability of failure of structural and monetary consequences of failure, and accounts for the material damage from time to time. The purpose of this study was to determine the factors (events that enable the) risk on pile foundation work and determine the weight/risk priority ranking of pile foundation work execution. This study uses analysis Analytical Hierarchy Process (AHP) to obtain risk factors pile foundation dominant conveyor manufacturing building consisting of 21 risk factors (criteria). The risk assessment carried out by 5 (five) Expert. The results in getting the expert assessment of the risk factors pile foundation work of the most dominant is the criterion of cost control systems are a weak and weak time control system.\",\"PeriodicalId\":424923,\"journal\":{\"name\":\"International Journal of Engineering Research and Advanced Technology\",\"volume\":\"38 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Engineering Research and Advanced Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31695/ijerat.2019.3445\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Engineering Research and Advanced Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31695/ijerat.2019.3445","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

作为疾病原因的风险因素预计不会造成任何伤害、损害或损失。基于结构失败的可能性和失败的经济后果的风险度量,并考虑到不时的物质损害。本研究的目的是确定桩基工作的风险因素(事件),并确定桩基工作执行的权重/风险优先级排序。本研究采用层次分析法(AHP)得到了由21个风险因素(准则)组成的桩基优势输送机制造厂房的风险因素。风险评估由5(5)位专家进行。在获得专家评价结果的桩基工程风险因素中最占主导地位的是成本控制体系的薄弱和时间控制体系的薄弱。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Risk Management of Pile Foundation Work Using Analytical Hierarchy Process Method (AHP)
ABSTRACT Risk factors as the cause of the condition are not expected to cause any harm, damage or loss. The measure of risk based on the probability of failure of structural and monetary consequences of failure, and accounts for the material damage from time to time. The purpose of this study was to determine the factors (events that enable the) risk on pile foundation work and determine the weight/risk priority ranking of pile foundation work execution. This study uses analysis Analytical Hierarchy Process (AHP) to obtain risk factors pile foundation dominant conveyor manufacturing building consisting of 21 risk factors (criteria). The risk assessment carried out by 5 (five) Expert. The results in getting the expert assessment of the risk factors pile foundation work of the most dominant is the criterion of cost control systems are a weak and weak time control system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Object Boundaries Detection Based Center Of Gravity Optimization of Interval Type-2 Fuzzy Logic System for Software Reliability Prediction Analysis of Quality Control for Automatic Transmission Products MCVT Model By Six Sigma Approach at PT HPPM, Indonesia A New wireless sensor networks Routing Algorithm Based on SPIN Protocols and Circumference Technique Optimization of Production process in Sewing Work for Ethiopia Cultural Clothe Apparel Production
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1